Arthur qwenk's Blog – November 2020 Archive (4)

Noise Testing Results and Data Analysis "testing". Compare to Data Voting Patterns of Nov 3-4?

This election's results are as interesting as Wind Companies denying the existence of DbC and allowing only Dba testing (for those who understand the implications ). (Low frequency noise is deleterious to   human health which is created by wind turbines at distances sometimes beyond 2 miles).

See this ,concerning data dumps in this election, in the" WEE hours" of November 3-4.

Anomalies in Vote Counts and…

Continue

Added by arthur qwenk on November 30, 2020 at 6:00pm — 5 Comments

Wind Data Manipulation, As Well as 2020 Election Fraud, Only to be Surpassed by Covid-19 Political Weaponization.

We all know how wind data is manipulated in an attempt to rationalize the feckless fraud.

How About  Election 2020 Data fraud?

Then How About the  Covid -19 Data we are led to believe as factual?

The Common Thread ? Deceiving and lying to  "We the People".

Please see this important video Webinar by Dr. Genevieve Briand of Johns Hopkins University.

A bit dry, but hang  with it, ( if you dare ) and  be more aggravated than ever.

How…

Continue

Added by arthur qwenk on November 28, 2020 at 10:30pm — 7 Comments

How the game is Rigged, Be it "Wind Research", "Green New Deal Data", or National Elections. A line of "Code"

You Sir/Madam, are worth .87 on that   computer code line for weighting , we are ranked at 1.13...

YOU LOSE!

#for (Tr=.87; B<100; ++i) printf("Biden"); Where i=additive factor for B

#Remove # to activate

and for that Turbine Noise Data......that 45 DBa won't hurt one bit ... (for those who know what I am talking about). The Turbine Noise is "like a refrigerator".

And so my friends, we are now down to  who…

Continue

Added by arthur qwenk on November 22, 2020 at 10:00am — 9 Comments

So You Think First Wind Was Corrupt? Try This...

We know that the infamous Wind Law of Maine, PL-661 (which still stands today) was forced through w/o discussion in 2008 by Governor Baldacci et  al. As corrupting as the law has been, as destructive and useless as the wind scam has been, nothing can compare to these two videos.

https://www.youtube.com/watch?v=MQMqHaR9N5k&ab_channel=BlazeTV…

Continue

Added by arthur qwenk on November 19, 2020 at 5:30pm — 8 Comments

Monthly Archives

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2010

2009

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service