The Wind industry fraud on America is a far bigger mess than the Hillary emails or the disgusting Clinton foundation. Their slimy game plan is the same as the wind industry's, to keep lying and keep killing the messenger so they can continue to rob taxpayers.
Hillary and Bill have played a great part in this fraud on America. That's why nailing Hillary…
ContinueAdded by Jim Wiegand on October 29, 2016 at 3:30pm — 2 Comments
https://medium.com/@jimwiegand/comments-on-icebreaker-6bb3bad6ff66#.mmb037f5r ; In these comments is the hideous truth about wind energy, this industry's research fraud and the environmental destruction being caused by wind energy. These comments were filed with Ohio.gov on 10/21 in response to the hundreds of 700 ft. turbines…
ContinueAdded by Jim Wiegand on October 27, 2016 at 1:00pm — 2 Comments
When corruption rules .............Research is routinely rigged.
The annual estimated bird mortality from wind turbines in the US is claimed to be no more than 573,000. However I want to point out that this number used by the bird conservation groups, the media and Government agencies, was created from a culmination of fake industry studies using a variety of highly deceptive research methodology tricks.
Then using all this false data from the industry’s fake studies, a new…
ContinueAdded by Jim Wiegand on October 17, 2016 at 2:18pm — No Comments
The Icebreaker project is the first of what will end up being several hundred turbines placed on lake Erie. Hundreds of massive wind turbines that will kill tens of thousands of birds annually are being planned for Lake Erie. Property values will also be greatly impacted.
I can not emphasize this enough, the MO of this industry is to lie, lie again, pay others to lie for you and to keep on lying until the profits stop. It has been that way since 1985 when the results of first and…
ContinueAdded by Jim Wiegand on October 15, 2016 at 2:00pm — 5 Comments
When corruption rules the public is fed lies. One of these lies is that the Altamont Pass area has largest density of breeding Golden Eagles in the world. This myth was made up from bogus wind industry research.
Altamont is important because this wind energy site has been slaughtering golden eagles for decades. In 2015 the USGS published a report that estimated the eagle population to be approximately 280 pairs in a 2000 square mile region around Altamont. They came to this conclusion…
ContinueAdded by Jim Wiegand on October 12, 2016 at 9:08pm — 4 Comments
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
U.S. Sen Angus King
Maine as Third World Country:
CMP Transmission Rate Skyrockets 19.6% Due to Wind Power
Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.
Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT
******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********
(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/
Not yet a member?
Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?
We have the facts on our side. We have the truth on our side. All we need now is YOU.
“First they ignore you, then they laugh at you, then they fight you, then you win.”
-- Mahatma Gandhi
"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi
Task Force membership is free. Please sign up today!
Hannah Pingree - Director of Maine's Office of Innovation and the Future
"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."
https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/