This Article is of Special Interest Regarding the Benefits of CO2

https://www.windtaskforce.org/profiles/blogs/natural-forces-cause-p...

https://www.windtaskforce.org/profiles/blogs/hunga-tonga-volcanic-e...

.

Urban Heat Archipelagos

UHAs, such as on the US East Coast, from Portland, Maine, to Norfolk, Virginia, significantly contribute to local warming. That area used to be covered with forests.

Many large solar systems in the US Southwest add up to a heat archipelago, plus the very hot PV panels have very low efficiencies at high temperatures 

Adaptation, such as increasing the width and height of dikes, and capacities of culvert and storm sewer systems, etc., planting billions of trees each year, rebuilding the rain forests, etc., will be required.

Because, huge quantities of solar energy are collected in the Tropics to warm the planet each day, preservation of the world's rain forest belt is vital for the future well-being of the earth.
That should have priority over expensive, unfeasible, wind/solar/battery/EV/heat pump, etc., measures, implemented mostly in temperate zones.

.

.
Important Role of CO2 for Flora Growth
Many plants require greater CO2 than 400 ppm to survive and thrive, so they became extinct, along with the fauna they supported. As a result, many areas of the world became arid and deserts.

Fossil fuels are a blessing, because their CO2 may help increase the earth temperature, increase water vapor, increase fauna and flora

Earth temperature increased about 1.2 C since 1900, which can be due to many causes, including fossil CO2, flora CO2, ocean CO2, and permafrost methane which converts to CO2

The current CO2 needs to at least double or triple to reinvigorate the world's flora and fauna.
CO2 has increased from about 280 ppm in 1900 to 423 ppm at end 2023. It increased:
.
1) Greening of the world by at least 10 to 15%, as measured by satellites since 1979.
2) Crop yields per acre.
.

.

.

APPENDIX 1

World Offshore Wind Capacity Placed on Operation in 2021

During 2021, worldwide offshore wind capacity placed in operation was 17,398 MW, of which China 13,790 MW, and the rest of the world 3,608 MW, of which UK 1,855 MW; Vietnam 643 MW; Denmark 604 MW; Netherlands 402 MW; Taiwan 109 MW

Of the 17,398 MW, just 57.1 MW was floating, about 1/3%

At end of 2021, 50,623 MW was in operation, of which just 123.4 MW was floating, about 1/4%

https://www.energy.gov/eere/wind/articles/offshore-wind-market-repo...

 

Floating Offshore Wind Systems in the Impoverished State of Maine

https://www.windtaskforce.org/profiles/blogs/floating-offshore-wind...

Despite the meager floating offshore MW in the world, pro-wind politicians, bureaucrats, etc., aided and abetted by the lapdog Main Media and "academia/think tanks", in the impoverished State of Maine, continue to fantasize about building 3,000 MW of 850-ft-tall floating offshore wind turbines by 2040!!

 

Maine government bureaucrats, etc., in a world of their own climate-fighting fantasies, want to have about 3,000 MW of floating wind turbines by 2040; a most expensive, totally unrealistic goal, that would further impoverish the already-poor State of Maine for many decades.

 

Those bureaucrats, etc., would help fatten the lucrative, 20-y, tax-shelters of mostly out-of-state, multi-millionaire, wind-subsidy chasers, who likely have minimal regard for:

 

1) Impacts on the environment and the fishing and tourist industries of Maine, and

2) Already-overstressed, over-taxed, over-regulated Maine ratepayers and taxpayers, who are trying to make ends meet in a near-zero, real-growth economy.

 

Those fishery-destroying, 850-ft-tall floaters, with 24/7/365 strobe lights, visible 30 miles from any shore, would cost at least $7,500/ installed kW, or at least $22.5 billion, if built in 2023 (more after 2023)

 

Almost the entire supply of the Maine projects would be designed and made in Europe, then transported across the Atlantic Ocean, in European specialized ships, then unloaded at a new, $500-million Maine storage/pre-assembly/staging/barge-loading area, then barged to European specialized erection ships for erection of the floating turbines. The financing will be mostly by European pension funds.

 

About 300 Maine people would have jobs during the erection phase

The other erection jobs would be by specialized European people, mostly on cranes and ships

About 100 Maine people would have long-term O&M jobs, using European spare parts, during the 20-y electricity production phase.

https://www.maine.gov/governor/mills/news/governor-mills-signs-bill...

 

The Maine woke bureaucrats are falling over each other to prove their “greenness”, offering $millions of this and that for free, but all their primping and preening efforts has resulted in no floating offshore bids from European companies

 

The Maine people have much greater burdens to look forward to for the next 20 years, courtesy of the Governor Mills incompetent, woke bureaucracy that has infested the state government 

 

The Maine people need to finally wake up, and put an end to the climate scare-mongering, which aims to subjugate and further impoverish them, by voting the entire Democrat woke cabal out and replace it with rational Republicans in 2024

The present course leads to financial disaster for the impoverished State of Maine and its people.

The purposely-kept-ignorant Maine people do not deserve such maltreatment

 

Electricity Cost: Assume a $750 million, 100 MW project consists of foundations, wind turbines, cabling to shore, and installation at $7,500/kW.

Production 100 MW x 8766 h/y x 0.40, CF = 350,640,000 kWh/y

Amortize bank loan for $525 million, 70% of project, at 6.5%/y for 20 years, 13.396 c/kWh.

Owner return on $225 million, 30% of project, at 10%/y for 20 years, 7.431 c/kWh

Offshore O&M, about 30 miles out to sea, 8 c/kWh.

Supply chain, special ships, and ocean transport, 3 c/kWh

All other items, 4 c/kWh 

Total cost 13.396 + 7.431 + 8 + 3 + 4 = 35.827 c/kWh

Less 50% subsidies (ITC, 5-y depreciation, interest deduction on borrowed funds) 17.913 c/kWh

Owner sells to utility at 17.913 c/kWh

 

NOTE: The above prices compare with the average New England wholesale price of about 5 c/kWh, during the 2009 - 2022 period, 13 years, courtesy of:

 

Gas-fueled CCGT plants, with low-cost, low-CO2, very-low particulate/kWh

Nuclear plants, with low-cost, near-zero CO2, zero particulate/kWh

Hydro plants, with low-cost, near-zero-CO2, zero particulate/kWh

Cabling to Shore Plus $Billions for Grid Expansion on Shore: A high voltage cable would be hanging from each unit, until it reaches bottom, say about 200 to 500 feet. 
The cables would need some type of flexible support system

There would be about 5 cables, each connected to sixty, 10 MW wind turbines, making landfall on the Maine shore, for connection to 5 substations (each having a 600 MW capacity, requiring several acres of equipment), then to connect to the New England HV grid, which will need $billions for expansion/reinforcement to transmit electricity to load centers, mostly in southern New England.

 

Floating Offshore a Major Financial Burden on Maine People: Rich Norwegian people can afford to dabble in such expensive demonstration follies (See Appendix 2), but the over-taxed, over-regulated, impoverished Maine people would buckle under such a heavy burden, while trying to make ends meet in the near-zero, real-growth Maine economy. Maine folks need lower energy bills, not higher energy bills.

 

APPENDIX 2

Floating Offshore Wind in Norway

Equinor, a Norwegian company, put in operation, 11 Hywind, floating offshore wind turbines, each 8 MW, for a total of 88 MW, in the North Sea. The wind turbines are supplied by Siemens, a German company

Production will be about 88 x 8766 x 0.5, claimed lifetime capacity factor = 385,704 MWh/y, which is about 35% of the electricity used by 2 nearby Norwegian oil rigs, which cost at least $1.0 billion each.

On an annual basis, the existing diesel and gas-turbine generators on the rigs, designed to provide 100% of the rigs electricity requirements, 24/7/365, will provide only 65%, i.e., the wind turbines have 100% back up.

The generators will counteract the up/down output of the wind turbines, on a less-than-minute-by-minute basis, 24/7/365

The generators will provide almost all the electricity during low-wind periods, and 100% during high-wind periods, when rotors are feathered and locked.

The capital cost of the entire project was about 8 billion Norwegian Kroner, or about $730 million, as of August 2023, when all 11 units were placed in operation, or $730 million/88 MW = $8,300/kW. See URL

That cost was much higher than the estimated 5 billion NOK in 2019, i.e., 60% higher

The project is located about 70 miles from Norway, which means minimal transport costs of the entire supply to the erection sites

The project would produce electricity at about 42 c/kWh, no subsidies, at about 21 c/kWh, with 50% subsidies 

In Norway, all work associated with oil rigs is very expensive.

Three shifts of workers are on the rigs for 6 weeks, work 60 h/week, and get 6 weeks off with pay, and are paid well over $150,000/y, plus benefits.

If Norwegian units were used in Maine, the production costs would be even higher in Maine, because of the additional cost of transport of almost the entire supply, including specialized ships and cranes, across the Atlantic Ocean, plus

A high voltage cable would be hanging from each unit, until it reaches bottom, say about 200 to 500 feet. 

The cables would need some type of flexible support system
The cables would be combined into several cables to run horizontally to shore, for at least 25 to 30 miles, to several onshore substations, to the New England high voltage grid.

.

https://www.offshore-mag.com/regional-reports/north-sea-europe/arti...

https://en.wikipedia.org/wiki/Floating_wind_turbine

.

.

APPENDIX 3

Offshore Wind in US and UK

Most folks, seeing only part of the picture, write about wind energy issues that only partially cover the offshore wind situation, which caused major declines of the stock prices of Siemens, Oersted, etc., starting at the end of 2020; the smart money got out
All this well before the Ukraine events, which started in February 2022. See costs/kWh in below article

US/UK Governments Offshore Wind Goals

1) 30,000 MW of offshore by 2030, by the cabal of climate extremists in the US government 
2) 36,000 MW of offshore by 2030, and 40,000 MW by 2040, by the disfunctional UK government

 

Those US/UK goals are physically unachievable, even with abundant, low-cost financing, and low inflation, and low-cost energy, materials, labor, and a robust, smooth-running supply chain, to place in service about 9500 MW of offshore during each of the next 7 years, from start 2024 to end 2030, which has never been done before in such a short time. See URL
 
US/UK 66,000 MW OF OFFSHORE WIND BY 2030; AN EXPENSIVE FANTASY  
https://www.windtaskforce.org/profiles/blogs/biden-30-000-mw-of-off...

US Offshore Wind Electricity Production and Cost

 

Electricity production about 30,000 MW x 8766 h/y x 0.40, lifetime capacity factor = 105,192,000 MWh, or 105.2 TWh. The production would be about 100 x 105.2/4000 = 2.63% of the annual electricity loaded onto US grids.

Electricity Cost, c/kWh: Assume a $550 million, 100 MW project consists of foundations, wind turbines, cabling to shore, and installation, at $5,500/kW.

Production 100 MW x 8766 h/y x 0.40, CF = 350,640,000 kWh/y

Amortize bank loan for $385 million, 70% of project, at 6.5%/y for 20 y, 9.824 c/kWh.

Owner return on $165 million, 30% of project, at 10%/y for 20 y, 5.449 c/kWh

Offshore O&M, about 30 miles out to sea, 8 c/kWh.

Supply chain, special ships, ocean transport, 3 c/kWh

All other items, 4 c/kWh 

Total cost 9.824 + 5.449 + 8 + 3 + 4 = 30.273 c/kWh

Less 50% subsidies (ITC, 5-y depreciation, interest deduction on borrowed funds) 15.137 c/kWh

Owner sells to utility at 15.137 c/kWh; developers in NY state, etc., want much more. See Above.

 

Not included: At a future 30% wind/solar penetration on the grid:   

Cost of onshore grid expansion/reinforcement, about 2 c/kWh

Cost of a fleet of plants for counteracting/balancing, 24/7/365, about 2.0 c/kWh

In the UK, in 2020, it was 1.9 c/kWh at 28% wind/solar loaded onto the grid

Cost of curtailments, about 2.0 c/kWh

Cost of decommissioning, i.e., disassembly at sea, reprocessing and storing at hazardous waste sites

.

APPENDIX 4

Levelized Cost of Energy Deceptions, by US-EIA, et al.

Most people have no idea wind and solar systems need grid expansion/reinforcement and expensive support systems to even exist on the grid.

With increased annual W/S electricity percent on the grid, increased grid investments are needed, plus greater counteracting plant capacity, MW, especially when it is windy and sunny around noon-time.

Increased counteracting of the variable W/S output, places an increased burden on the grid’s other generators, causing them to operate in an inefficient manner (more Btu/kWh, more CO2/kWh), which adds more cost/kWh to the offshore wind electricity cost of about 16 c/kWh, after 50% subsidies

The various cost/kWh adders start with annual W/S electricity at about 8% on the grid.

The adders become exponentially greater, with increased annual W/S electricity percent on the grid

 

The US-EIA, Lazard, Bloomberg, etc., and their phony LCOE "analyses", are deliberately understating the cost of wind, solar and battery systems

Their LCOE “analyses” of W/S/B systems purposely exclude major LCOE items.

Their deceptions reinforced the popular delusion, W/S are competitive with fossil fuels, which is far from reality.

The excluded LCOE items are shifted to taxpayers, ratepayers, and added to government debts.

W/S would not exist without at least 50% subsidies

W/S output could not be physically fed into the grid, without items 2, 3, 4, 5, and 6. See list.

 

1) Subsidies equivalent to about 50% of project lifetime owning and operations cost,

2) Grid extension/reinforcement to connect remote W/S systems to load centers

3) A fleet of quick-reacting power plants to counteract the variable W/S output, on a less-than-minute-by-minute basis, 24/7/365 

4) A fleet of power plants to provide electricity during low-W/S periods, and 100% during high-W/S periods, when rotors are feathered and locked,

5) Output curtailments to prevent overloading the grid, i.e., paying owners for not producing what they could have produced

6) Hazardous waste disposal of wind turbines, solar panels and batteries. See image.

.

APPENDIX  5

BATTERY SYSTEM CAPITAL COSTS, OPERATING COSTS, ENERGY LOSSES, AND AGING
https://www.windtaskforce.org/profiles/blogs/battery-system-capital...

 

EXCERPT:

Annual Cost of Megapack Battery Systems; 2023 pricing

Assume a system rated 45.3 MW/181.9 MWh, and an all-in turnkey cost of $104.5 million, per Example 2

Amortize bank loan for 50% of $104.5 million at 6.5%/y for 15 years, $5.484 million/y

Pay Owner return of 50% of $104.5 million at 10%/y for 15 years, $6.765 million/y (10% due to high inflation)

Lifetime (Bank + Owner) payments 15 x (5.484 + 6.765) = $183.7 million

Assume battery daily usage for 15 years at 10%, and loss factor = 1/(0.9 *0.9)

Battery lifetime output = 15 y x 365 d/y x 181.9 MWh x 0.1, usage x 1000 kWh/MWh = 99,590,250 kWh to HV grid; 122,950,926 kWh from HV grid; 233,606,676 kWh loss

(Bank + Owner) payments, $183.7 million / 99,590,250 kWh = 184.5 c/kWh

Less 50% subsidies (ITC, depreciation in 5 years, deduction of interest on borrowed funds) is 92.3c/kWh

At 10% throughput, (Bank + Owner) cost, 92.3 c/kWh

At 40% throughput, (Bank + Owner) cost, 23.1 c/kWh

 

Excluded costs/kWh: 1) O&M; 2) system aging, 1.5%/y, 3) 20% HV grid-to-HV grid loss, 4) grid extension/reinforcement to connect battery systems, 5) downtime of parts of the system, 6) decommissioning in year 15, i.e., disassembly, reprocessing and storing at hazardous waste sites. Excluded costs would add at least 15 c/kWh
 
NOTE: The 40% throughput is close to Tesla’s recommendation of 60% maximum throughput, i.e., not charging above 80%  full and not discharging below 20% full, to achieve a 15-y life, with normal aging

 

NOTE: Tesla’s recommendation was not heeded by the Owners of the Hornsdale Power Reserve in Australia. They excessively charged/discharged the system. After a few years, they added Megapacks to offset rapid aging of the original system, and added more Megapacks to increase the rating of the expanded system.

http://www.windtaskforce.org/profiles/blogs/the-hornsdale-power-reserve-largest-battery-system-in-australia

 

COMMENTS ON CALCULATION: 

Regarding any project, the bank and the owner have to be paid.
Therefore, I amortized the bank loan and the owner’s investment

If you divide total payments over 15 years by throughput during 15 years, you get the cost per kWh, as shown.

According to EIA annual reports, almost all battery systems have throughputs less than 10%. I chose 10% for calculations.

A few battery systems have higher throughputs, if used to absorb midday solar and discharge it the during peak hour periods of late-afternoon/early-evening. They may reach up to 40% throughput. I chose 40% for calculations.

Remember, you have to draw about 50 MWh from the HV grid to deliver about 40 MWh to the HV grid, because of A-to-Z system losses. That gets worse with aging.

A lot of people do not like these c/kWh numbers, because they have been repeatedly told by self-serving folks, low-cost battery Nirvana is just around the corner, which is a load of crap.

APPENDIX 6 

SolarEdge Technologies shares plunged about two weeks ago, after it warned about decreasing European demand. 

 

Solar Panels Are Much More Carbon-Intensive Than Experts are Willing to Admit

https://www.windtaskforce.org/profiles/blogs/solar-panels-are-more-...

 

The Great Green Crash – Solar Down 40%

https://wattsupwiththat.com/2023/11/08/the-great-green-crash-solar-...

 

APPENDIX 7 

BATTERY SYSTEM CAPITAL COSTS, OPERATING COSTS, ENERGY LOSSES, AND AGING

https://www.windtaskforce.org/profiles/blogs/battery-system-capital...

 

Lifetime Performance of World’s First Offshore Wind System in the North Sea 

https://www.windtaskforce.org/profiles/blogs/lifetime-performance-o...

 

CO2 IS A LIFE GAS; NO CO2 = NO FLORA AND NO FAUNA

https://www.windtaskforce.org/profiles/blogs/co2-is-a-life-gas-no-c...

IRELAND FUEL AND CO2 REDUCTIONS DUE TO WIND ENERGY LESS THAN CLAIMED    

https://www.windtaskforce.org/profiles/blogs/fuel-and-co2-reduction...

 

APPENDIX 8

Nuclear Plants by Russia

According to the IAEA, during the first half of 2023, a total of 407 nuclear reactors are in operation at power plants across the world, with a total capacity at about 370,000 MW

Nuclear was 2546 TWh, or 9.2%, of world electricity production in 2022

https://www.windtaskforce.org/profiles/blogs/batteries-in-new-england

Rosatom, a Russian Company, is building more nuclear reactors than any other country in the world, according to data from the Power Reactor Information System of the International Atomic Energy Agency, IAEA.

The data show, a total of 58 large-scale nuclear power reactors are currently under construction worldwide, of which 23 are being built by Russia.

.

In Egypt, 4 reactors, each 1,200 MW = 4,800 MW for $30 billion, or about $6,250/kW, 

The cost of the nuclear power plant is $28.75 billion.

As per a bilateral agreement, signed in 2015, approximately 85% of it is financed by Russia, and to be paid for by Egypt under a 22-year loan with an interest rate of 3%.
That cost is at least 40% less than US/UK/EU

.

In Turkey, 4 reactors, each 1,200 MW = 4,800 MW for $20 billion, or about $4,200/kW, entirely financed by Russia. The plant will be owned and operated by Rosatom

.

In India, 6 VVER-1000 reactors, each 1,000 MW = 6,000 MW at the Kudankulam Nuclear Power Plant.

Capital cost about $15 billion. Units 1, 2, 3 and 4 are in operation, units 5 and 6 are being constructed

In Bangladesh: 2 VVER-1200 reactors = 2400 MW at the Rooppur Power Station

Capital cost $12.65 billion is 90% funded by a loan from the Russian government. The two units generating 2400 MW are planned to be operational in 2024 and 2025. Rosatom will operate the units for the first year before handing over to Bangladeshi operators. Russia will supply the nuclear fuel and take back and reprocess spent nuclear fuel.

https://en.wikipedia.org/wiki/Rooppur_Nuclear_Power_Plant

.

Rosatom, created in 2007 by combining several Russian companies, usually provides full service during the entire project life, such as training, new fuel bundles, refueling, waste processing and waste storage in Russia, etc., because the various countries likely do not have the required systems and infrastructures

 

Nuclear: Remember, these nuclear plants reliably produce steady electricity, at reasonable cost/kWh, and have near-zero CO2 emissions

They have about 0.90 capacity factors, and last 60 to 80 years

Nuclear do not require counteracting plants. They can be designed to be load-following, as some are in France

.

Wind: Offshore wind systems produce variable, unreliable power, at very high cost/kWh, and are far from CO2-free, on a mine-to-hazardous landfill basis.
They have lifetime capacity factors, on average, of about 0.40; about 0.45 in very windy places

They last about 20 to 25 years in a salt water environment 
They require: 1) a fleet of quick-reacting power plants to counteract the up/down wind outputs, on a less-than-minute-by-minute basis, 24/7/365, 2) major expansion/reinforcement of electric grids to connect the wind systems to load centers, 3)  a lot of land and sea area, 4) curtailment payments, i.e., pay owners for what they could have produced

 

Major Competitors: Rosatom’s direct competitors, according to PRIS data, are three Chinese companies: CNNC, CSPI and CGN.
They are building 22 reactors, but it should be noted, they are being built primarily inside China, and the Chinese partners are building five of them together with Rosatom.

American and European companies are lagging behind Rosatom, by a wide margin,” Alexander Uvarov, a director at the Atom-info Center and editor-in-chief at the atominfo.ru website, told TASS.

 

Tripling Nuclear A Total Fantasy: During COP28, Kerry called for the world to triple nuclear, from 370,200 MW to 1,110,600 MW, by 2050.

https://phys.org/news/2023-12-triple-nuclear-power-cop28.html

 

Based on past experience in the US and EU, it takes at least 10 years to commission nuclear plants

Plants with about 39 reactors must be started each year, for 16 years (2024 to 2040), to fill the pipeline, to commission the final ones by 2050, in addition to those already in the pipeline.

 

New nuclear: Kerry’s nuclear tripling by 2050, would add 11% of world electricity generation in 2050. See table

Nuclear was 9.2% of 2022 generation. That would become about 5% of 2050 generation, if some older plants are shut down, and plants already in the pipeline are placed in operation, 

Total nuclear would be 11+ 5 = 16%; minimal impact on CO2 emissions and ppm in 2050. 

Infrastructures and Manpower: The building of the new nuclear plants would require a major increase in infrastructures and educating and training of personnel, in addition to the cost of the power plants.

https://www.visualcapitalist.com/electricity-sources-by-fuel-in-202....

  

APPENDIX 10

LIFE WITHOUT OIL?

Life without oil means many products that are made with oil, such as the hundreds listed below, would need to be provided by wind and solar and hydro, which can be done theoretically, but only at enormous cost.

Folks, including Biden's handlers, wanting to get rid of fossil fuels, such as crude oil, better start doing some rethinking.

The above also applies to natural gas, which is much preferred by many industries, such as glass making, and the chemical and drug industries.

If you do not have abundant, low-cost energy, you cannot have modern industrial economies.

Without Crude Oil, there can be no Electricity.

 

Every experienced engineer knows, almost all the parts of wind, solar and battery systems, for electricity generation and storage, from mining materials to manufacturing parts, to installation and commissioning, in addition to the infrastructures that produce materials, parts, specialized ships, etc., are made from the oil derivatives manufactured from raw crude oil.

.

.

Views: 17

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Willem Post on April 22, 2024 at 6:28am

German, UK folks, and all other CO2-reduction/phobia fanatics have wasted many $trillions on hare-brained wind/solar/battery/EV/Heat Pump, etc., schemes

They have impoverished tens of millions of people in the process, because they are spreading THE TRUE FAITH, based on their science, to save the world

The elites have made oodles of $billions in the process, FOR DECADES.
You will NEVER hear of a halt for building private planes and yachts!!

Excerpts from:

https://www.windtaskforce.org/profiles/blogs/natural-forces-cause-p...
https://www.windtaskforce.org/profiles/blogs/hunga-tonga-volcanic-e...

Retained Energy in Atmosphere

Dry Air and Water Vapor
ha = Cpa x T = 1006 kJ/kg.C x T, where Cpa is specific heat of dry air
hg = (2501 kJ/kg, specific enthalpy of WV at 0 C) + (Cpwv x T = 1.84 kJ/kg x T), where Cpwv is specific heat of WV at constant pressure
.
1) Worldwide, determine enthalpy of moist air: T = 16 C and H = 0.0025 kg WV/kg dry air (4028 ppm)
h = ha + H.hg = (1.006T) + H(2501 + 1.84T) = 1.006 (16) + 0.0025 {2501 + 1.84 (16)} = 22.4 kJ/kg dry air
About 16.1 kJ/kg of dry air is retained by air and 6.3 kJ/kg by WV
.
2) Tropics, determine enthalpy of moist air: T = 27 C and H = 0.017 kg WV/kg dry air (27389 ppm)
h = 1.006 (27) + 0.017 {2501 + 1.84 (16)} = 70.5 kJ/kg dry air 
About 27.2 kJ/kg of dry air is retained by air and 43.3 kJ/kg by WV
https://www.wikihow.com/Calculate-the-Enthalpy-of-Moist-Air#:~:text....
.
CO2
h CO2 = Cp CO2 x K = 0.834 x (16 + 273) = 241 kJ/kg CO2, where Cp CO2 is specific heat 
.
Worldwide, determine enthalpy of CO2 = {(423 x 44)/(1000000 x 29 = 0.000642 kg CO2/kg dry air} x
241 kJ/kg CO2) @ 289 K = 0.155 kJ/kg dry air.
.
Retained energy, world: (16.1 + 6.3 + 0.155) kJ/kg dry air) x 1000j/kJ x 5.148 x 10^18 kg, atmosphere/10^18 = 1.161 x 10^5 EJ
.
Retained energy, Tropics: (27.2 + 43.3 + 0.155) kJ/kg dry air x 1000J/kJ x 2.049 x 10^18 kg, atmosphere/10^18 = 1,448 x 10^4 EJ. Some of the energy is transferred to other latitudes
.
The Tropics is a giant energy storage area, almost all of it by evaporating water.
CO2 plays a 100 x (0.155/70.655) = 0.219% role.  
About 35% of the Tropics energy is transferred, 24/7/365, to latitudes north and south of the 37 parallels, which do not get enough incoming solar energy.
Humans consumed 604/365 = 1.65 EJ/d, in 2022 

Comment by Willem Post on April 14, 2024 at 3:30pm

The A to Z oil/gas/coal efforts are three times less costly than highly subsidized, uneconomic, unfeasible, wind/solar/battery/EV/heat pump follies, plus they produce tens of thousands of everyday products.

Everyone knows that, but the Europeans want to push the US, etc., into that uneconomic, unfeasible straight jacket, because Europe does not HAVE oil/gas/coal, which makes Europe less competitive on world markets; curtains closed!!

Alway look at A to Z processes, from mine to hazardous-waste landfill

Levelized Cost of Energy Deceptions, by US-EIA, et al.

Most people have no idea wind and solar systems need grid expansion/reinforcement and expensive support systems to even exist on the grid.

With increased annual W/S electricity percent on the grid, increased grid investments are needed, plus greater counteracting plant capacity, MW, especially when it is windy and sunny around noon-time.

Increased counteracting of the variable W/S output, places an increased burden on the grid’s other generators, causing them to operate in an inefficient manner (more Btu/kWh, more CO2/kWh), which adds more cost/kWh to the offshore wind electricity cost of about 16 c/kWh, after 50% subsidies

The various cost/kWh adders start with annual W/S electricity at about 8% on the grid.

The adders become exponentially greater, with increased annual W/S electricity percent on the grid

 

The US-EIA, Lazard, Bloomberg, etc., and their phony LCOE "analyses", are deliberately understating the cost of wind, solar and battery systems

Their LCOE “analyses” of W/S/B systems purposely exclude major LCOE items.

Their deceptions reinforced the popular delusion, W/S are competitive with fossil fuels, which is far from reality.

The excluded LCOE items are shifted to taxpayers, ratepayers, and added to government debts.

W/S would not exist without at least 50% subsidies

W/S output could not be physically fed into the grid, without items 2, 3, 4, 5, and 6. See list.

 

1) Subsidies equivalent to about 50% of project lifetime owning and operations cost,

2) Grid extension/reinforcement to connect remote W/S systems to load centers

3) A fleet of quick-reacting power plants to counteract the variable W/S output, on a less-than-minute-by-minute basis, 24/7/365 

4) A fleet of power plants to provide electricity during low-W/S periods, and 100% during high-W/S periods, when rotors are feathered and locked,

5) Output curtailments to prevent overloading the grid, i.e., paying owners for not producing what they could have produced

6) Hazardous waste disposal of wind turbines, solar panels and batteries. See image.

Comment by Willem Post on April 14, 2024 at 2:55pm

Russia has enough oil, gas, coal, etc., to supply itself, China, India, etc. for at least 100 years.
Russia has not even started to frack for oil and gas

That is the main reason the US wants to use screwed-up/desperate Ukraine as a proxy to “weaken” Russia towards impotence/breakup, which would maintain the US/EU in the world command/control driver seat

However, all leaders, on both sides, are aware of the stakes.

Russia will deal with Ukraine as it sees fit, and will streamline its economy for efficient GDP growth, not the highly subsidized, very costly, unfeasible wind/solar/battery/EV/heat pump type, not the fluffy/foamy type, but the iron/steel/concrete type, to insulate itself from malign Western influence, and from sanctions, and from military build-ups near its borders.

The notion “past is a guide to future” is slow to die, due to cultural inertia.

A lack of open-mindedness/mental flexibility is fatal in a changing world

STEM is a common abbreviation for four closely connected areas of study: science, technology, engineering and mathematics.

Any leading country not keeping up with the latest, full spectrum STEM, is doomed to die.

The US is grossly lacking in STEM, plus deeply in debt to foreigners, plus poorly led by self-serving elites.

UKRAINE A GEO-POLITICAL PAWN OF US/UK/NATO TO WEAKEN RUSSIA
https://www.windtaskforce.org/profiles/blogs/the-plot-is-thickening...
 
By advancing NATO to Russia’s borders (after promising not to do so beyond East Germany, and using Ukraine as a proxy to “weaken” Russia, turned out to be a disaster for Ukraine and the US and the EU.
.
.

Russia Now Says It Expects ‘Unconditional Capitulation Of Zelensky Regime’ Before Peace 
https://www.windtaskforce.org/profiles/blogs/russia-now-says-it-exp...
.
BY TYLER DURDEN

Ukrainian cities and especially the country’s energy infrastructure have been getting pounded by intensified Russian missile and airstrikes over the past several days and weeks, leading to widespread power outages across the country.
.
Russia’s defense ministry said Friday, “Russian troops delivered 48 precision strikes at Ukrainian energy and military-industrial sites, army and mercenaries’ deployment areas over the past week in the special military operation in Ukraine.”
.
This included a Thursday morning attack which destroyed one of Ukraine’s largest power plants in the Kyiv region. “The goal of the strike were achieved. All the targets were destroyed,” Moscow said.
.
Ukrainian authorities are urging those with power to preserve and save their energy usage as much as possible..

.

Who pays the piper, calls the tune

Ukraine, with US/EU goading/approval, perpetrated genocide on its own citizens in East Ukraine from 2014 to 2022, until Russia put an end to it, starting in February 2022.

The US would like to weaken/dismantle Russia to keep its resources away from China, India, etc.; in 1990, it almost succeeded under naive Yeltsin.

The US thought it could do it again with pre-planned sanctions and using Ukraine as a proxy, with NATO barking at the gates of Russia.

Fortunately for Russia, the grandiose US notion backfired onto the US/EU.

At present, the US has GDP growth fueled by huge federal, pump-priming deficits for overly expensive, unfeasible uneconomical wind/solar/battery/EV/heat pump and open border fiascos.

The EU is stuck with the same fiascos, at near-zero GDP growth

Comment by Willem Post on April 14, 2024 at 2:37pm

1) An unelected, self-serving Obama/Clinton cabal is using their “installed” lying-Biden as a worn-out marionette, who can’t form a sentence, can’t deal with a teleprompter, is totally addled, does not know how to climb a stair, needs handholding, to advance their disastrously expensive, leftist wind/solar/battery/EV/heat pump agenda, to turn the US in some kind of zombie “state”, with uncontrolled borders, with chaotic crime epidemics, with endangered communities, because of a flood of illegals, so the cabal can permanently wrest political command/control, and the very soul, from the long-suffering/impoverished US people.
.
That cabal will stop at nothing, do whatever it takes, to keep hold of the levers of power
.
2) A study revealed that the annual mean temperature of OSLO has increased by 1.5 °C in the period 1838–2012.
https://www.researchgate.net/publication/269274665_The_Oslo_tempera
.
The most pronounced increase in annual temperature occurred during the last 50 years, and in the early 20th century that ended with a local maximum in the 1930s.
.
The temperature has increased significantly in all seasons; however, the temperature increase in summer was less than a half of that in winter and spring, which were the seasons with largest increase.
.
In addition the monthly mean temperature of the coldest month in each year has increased two times faster than the warmest one.
.
3) That corresponds to temps in Vermont, per NOAA
GLOBAL WARMING IN VERMONT
https://www.windtaskforce.org/profiles/blogs/global-warming-in-vermont

Summer
Each year has peak temperatures during the summer months June, July, August. The below graph shows those peak temperatures in Vermont, for about 40 years.
 
Those temperatures were measured by the weather stations in Vermont of the National Oceanic and Atmospheric Administration, NOAA
 
Vermont has four weather stations; Burlington, St Johnsbury, Castleton and Windsor.
New Hampshire also has four stations
 
The peak temperatures increased by 1.5 F over 40 years, or 0.0375 F per year.
 
Almost all people cannot sense the difference of 77 F and 78.5 F
.
Winter
A similar graph shows the minimum temperatures during the months of December, January, February
 
The minimum temperatures increased by 4.2 F over 40 years, or 0.1 F per year. 
Most older Vermonters agree, winters in Vermont have been getting warmer.
Heating demand is driven by temperature difference, which was about 65 F, indoor – 9.8 F, outdoor = 55.2 F in 1980, and became 65 F, indoor – 14 F outdoor = 51 F in 2020
.
At present, it takes 7.6% less Btu for space heating a house than 40 years ago. 

4) I built my house in 1986. It is above average regarding energy efficiency of VT housing.

If I were to build another house, it would be highly insulated and sealed, and be off the grid, and have ground source heat pumps, solar panels, batteries, generator, and 1000-gal hot water storage tank.

No heating, hot water and electric bills, a saving of at least $6000/y; I would have to make $10,000 to have $6000 left over after fed and state taxes.

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service