SYNAPSE STUDY OF NEW ENGLAND FUTURE GAS CONSUMPTION AND PIPELINE REQUIREMENTS

Synapse Energy Economics prepared an analysis and report of state energy policy impacts on future natural gas consumption in New England’s electric sector.

http://www.synapse-energy.com/sites/default/files/New-Englands-Shri...

 

"First, with or without a new pipeline, existing laws and regulations will cumulatively require New England’s use of natural gas for electric generation to decrease by 27 percent by 2023, relative to 2015 levels."  

 

The below section ALTERNATIVE EVALUATION OF GAS CONSUMPTION AND PIPELINES, shows there will be no shrinking of NE gas requirements due to:

 

- Normal GDP growth of the NE economy of about 2%/y

- Millions of additional heat pumps for building space heating to replace about 1/3 of the fossil fuels presently used by traditional heating systems. The traditional systems would supply the other 2/3.

- Millions of light duty electric vehicles to replace light duty internal combustion vehicles.

 

http://www.windtaskforce.org/profiles/blogs/fact-checking-regarding...

http://www.windtaskforce.org/profiles/blogs/vermont-baseless-claims...

http://www.windtaskforce.org/profiles/blogs/replacing-gasoline-cons...

 

Imported High-Cost Liquid Natural Gas Versus Low-Cost Domestic Natural Gas:

Synapse and its clients want to ship more LNG through the Everett terminal, but one must not forget that additional LNG would not be coming from friendly Trinidad at about $5/million Btu, but from hostile Russia and the Middle East at about $9/million Btu, in foreign-owned tankers, built in foreign shipyards, crewed by foreigners.

 

Sending $dollars abroad to buy gas when the US has an abundance of gas appears not too smart to me. It is downright subversive, as it would be adding to the US trade deficit and would fail to put America first.

 

Sponsors of Synapse Studies

1) Synapse was hired by the following anti-pipeline/anti-fossil fuel entities:

 

- The Connecticut Fund for the Environment, Consumers for Sensible Energy

- Mass Energy Consumers Alliance

- Pipe Line Awareness Network for the Northeast Sierra Club Connecticut

- Sierra Club Massachusetts

 

2) Synapse performed an analysis of the ISO-NE “Operational Fuel Security Analysis”. See URL.

https://www.clf.org/wp-content/uploads/2018/05/Understanding-ISO-NE...

 

An RE activist group paid Synapse:

 

- Conservation Law Foundation

- Acadia Center

- New Hampshire Office of the Consumer Advocate

- PowerOptions

- RENEW Northeast

- Vermont Energy Investment Corporation

 

The group did not like the way ISO-NE had made its analysis.

The group is avidly promoting wind, solar, and other measures.

Synapse is their go-to consultant to provide them with reports that support their views and objectives.

 

The Synapse analysis claimed:

 

- The ISO-NE analysis "suffers" from being overly conservative and therefore used flawed assumptions about how the NE grid is likely to evolve in the future.

 

- ISO-NE is not being realistic regarding current grid and fuel conditions, and also not understanding the future development of RE, in particular wind and solar.

 

- ISO-NE did not sufficiently take into account the mandated RE build-outs enacted by the six legislatures of New England.

 

3) The following RE entities are agitating, by various means, in favor of high-cost LNG instead of abundant, low-cost, domestic NG from Pennsylvania.

 

- Sierra Club

- Conservation Law Foundation

- Acadia Center

- New Hampshire Office of the Consumer Advocate

- PowerOptions

- RENEW Northeast

- Vermont Energy Investment Corporation

- Cere

 

These RE entities are against more pipelines for bringing gas from Pennsylvania, because they know what is good for us.

They are adamant about weaning us off fossil fuels, no matter what the cost or inconvenience.

They are in favor of more Russian/Middle East LNG that costs about 3 times as much as gas from Pennsylvania, and emits about 1.43/1.17 = 22.2% more CO2 than gas from Pennsylvania.

They think choosing to emit more CO2 for decades while “building out wind and solar” would be saving the world. See Appendix.

http://www.windtaskforce.org/profiles/blogs/new-england-will-need-t...

 

ALTERNATIVE EVALUATION OF GAS CONSUMPTION AND PIPELINES

 

Below is presented an alternative evaluation of NE gas consumption and additional pipelines. Other aspects are:

 

- Arranging existing gas turbine plants for duel-fuel (gas and fuel oil) firing

- Providing more gas and fuel oil storage facilities near existing dual fuel plants and near any new dual fuel plants.

 

NE Wind in 2017 and Projected to 2030

 

ISO-NE has incorporated future plans of the NE states regarding onshore and offshore wind. See table 1 and URL for latest summary of capacity and electricity generation fed to grid in 2017 and by 2030.

 

NOTE: In this article it is assumed all of the state plans are implemented by 2030

https://www.iso-ne.com/static-assets/documents/2018/12/clg_meeting_...

 

Table 1/NE wind

2017

Onshore

Offshore

2030

Addition

Addition

MW

MW

MW

MW

ME*

900

3723

4646

NH

185

28

213

VT

149

30

179

MA

113

10

5119

5242

RI

54

21

75

CT

5

0

1760

1765

Total

1429

3812

6879

12120

.

Generation, GWh

3280

10025

27136

40440

h/y

8766

8766

8766

8766

CF

0.266

0.300

0.450

0.381

 

*Maine has installed 923 MW, but about 23 MW is connected to Canadian grid, i.e., not “seen” by ISO-NE

 

NE PV Solar in 2017 and Projected to 2030

 

ISO-NE has incorporated future plans of the NE states regarding “before and after the meter” PV solar. See table 2 and URLs for latest summary of capacity and electricity generation fed to grid in 2017 and by 2030. The ISO-NE data were extrapolated to 2030.

 

NOTE: In this article it is assumed all of the state plans are implemented by 2030.

 

https://www.iso-ne.com/static-assets/documents/2018/02/02272018_pr_...

https://www.iso-ne.com/static-assets/documents/2018/12/clg_meeting_...

 

Table 2/NE solar

Per ISO-NE Per ISO-NE Extrapolated

Year

2017

2026

2030

Capacity, MW

2400

5750

8134

h/y

8766

8766

8766

CF

0.15

0.15

0.15

GWh

3156

7561

10696

BTM, table 3A

2276

5453

8042

ATM, table 3

880

2108

2654

 

NE Grid Load in 2017, and Projections for 2026 and 2030

 

Table 3 shows the:

- ISO-NE estimates for 2026

- Extrapolated estimates for 2030

 

With high levels of variable, intermittent wind and solar (wind and sun dependent), adequate flexible gas turbine capacity, with adequate gas/oil supply, has to be ready to run (kept in good repair), staffed and fueled for peaking, filling in and balancing to ensure electricity consumption by users exactly matches the electricity supplied to the grid, 24/7/365, regardless of whether there is adequate wind and/or sun.

Hour-By-Hour Analyses of Fuel Requirements for Electricity Generation

Synapse did not perform an hour-by-hour analysis to determine the hourly fuel requirements for:

 

- Generating electricity for general uses

- Generating electricity for heating buildings with normal fuels and heat pumps

- Operating vehicles with normal fuels and with electricity

- When the sum of wind and solar is minimal, i.e., near zero, for several days in a row, such as with snow and ice on the solar panels.

 

The Synapse report does not mention:

 

- ISO-NE has already performed an analysis of the projected NE grid load

- ISO-NE does not, at this time, know how fast electric vehicles and heat pumps will be deployed in future years.

- ISO-NE has observed, over the years, the actual build-outs of RE and energy efficiency usually are well short of and occur later than the avowed intentions of states. Synapse assumes all avowed intentions will be implemented and on time.

- ISO-NE states: "If rapid EV or electric heating adoption emerges, the impacts may need to be considered in the ISO’s outlook for the region’s demand and energy.

- ISO-NE plans to start working with regional stakeholders to quantify the impact of the states’ anti-fossil policies on long-term demand so that ISO-NE can understand their potential effects on the power system and reflect these in future Regional System Plans.

 

NOTE:It is likely, on an hour-to-hour basis, wind and solar could be minimal, i.e., near zero, at any time during the year, including during cold spells in winter, such as the severe, extended, cold spell of 2016/2017, which could have been made worse with snow and ice on the PV panels. That means a full complement of other energy sources must be available (ready to run, kept in good repair, staffed and fueled) at any time during the year, i.e., 24/7/365, to serve the NE electricity demand. Wind and solar must not be counted due to a lack of reliability. Reliability of supply, 24/7/365, must come before everything. How could people get to work with their EVs, if they had to rely on unreliable sources, such as wind and solar, which are near zero almost every morning?

 

NOTE: The Connecticut legislature voted to accept zero-carbon bids of two nuclear power plants, Millstone and Seabrook, and rejected bids of 6 wind entities in Maine.

https://nawindpower.com/ct-selects-bids-for-offshore-wind-solar-and...

http://www.windtaskforce.org/profiles/blogs/all-six-maine-onshore-w...

Projected Electricity Generation for 2026 and 2030

Table 3 shows the generation, GWh, of each energy source for 2017, 2026, and 2030, if planned wind, solar and other build-outs were implemented. Below are explanatory comments on table 3:

- The first two columns are from ISO-NE historic data 

- Coal generation is assumed at zero for 2026 and 2030

- Standard, low efficiency, gas/oil plants should be closed down and replaced with up to 60% efficient, dual fuel, gas turbine plants. The same quantity of fuel would generate more electricity.

- Gas generation is assumed to slightly increase as older, less efficient gas turbine plants are replaced with up to 60% efficient, dual fuel, gas turbine plants.

- Nuclear generation is assumed to decrease in 2026 and 2030, due to plants closing down.

- Hydro generation is assumed to slightly increase due to ongoing plants efficiency improvements

- Solar generation, ATM, is assumed to increase in accordance with ISO-NE projections

- Wind generation is assumed to increase in accordance with projects listed with ISO-NE

- Geo, Muni refuse, Biomass, Landfill gas generation are assumed about unchanged for 2026 and 2030

- Methane, farm and other generation is assumed to slightly increase for 2026 and 2030

- Net external ties is assumed to slightly increase in 2026 and 2030

- Pumping loss is assumed unchanged for 2026 and 2030. Pumping loss = electricity required for pumping to upper reservoir - electricity generated by flow from upper to lower reservoir. The round trip pumping loss, high voltage AC-to-high voltage AC, is about 25 to 30%.

https://www.iso-ne.com/static-assets/documents/2018/02/02272018_pr_...

 

Table 3/NE Grid Load

NE grid Load

NE grid Load

NE grid Load

NE grid Load

2017

2017

2026

2030

%

GWh

GWh

GWh

Coal

1.39

1684

0

0

Oil, incl. dual fuel GTs

0.57

696

700

700

Gas

40.64

49198

51000

52000

Total fossil

42.61

51578

51700

52700

.

 

 

 

 

Nuclear

26.05

31538

26173

15000

Hydro

7.08

8572

8700

8800

- Geo

0.00

0

0

0

- Solar, ATM

0.73

880

2108

2654

- Wind

2.71

3280

20000

40440

- Muni refuse

2.61

3165

3200

3200

- Biomass, i.e., wood

2.49

3014

3000

3000

- Landfill gas

0.37

447

450

450

- Methane, farm and other

0.04

44

50

50

- Steam

0.00

0

0

0

Total RE

8.95

10830

28808

49794

Other 

0.01

14

14

14

Total generation 

84.70

102532

115295

126108

Net external ties 

16.72

20243

22000

22000

- Québec

11.90

14401

- New Brunswick

3.56

4306

- New York

1.27

1536

Pumping loss 

-1.42

-1716

-1716

-1716

Net 

100.00

121059

135579

146392

ISO-NE Projected NE Consumption

 

The consumption for 2030 was assumed by extrapolation. See table 3A

The solar, BTM, for 2030 was assumed by extrapolation.

The "Difference" between “Net” at bottom of table 3 and “Consumption, with HP and EV” in table 3A is 11456 GWh for 2026 and 13736 GWh for 2030. These small differences are not material.

 

There cannot be any significant reduction in annual gas supply, because all gas supply will be needed to serve future electricity demand due to:

 

- Wind and solar varying from year to year (more or less wind and sun), as happens in Germany and Denmark

- Hydro varying from year to year (more or less rain/snow), as happens during drought periods

- Some wind, solar and energy efficiency measures not fully implemented, or not at all, or at a later date. 

 

NOTE: An hour-by-hour study of fuel and gas consumption would reveal the need for additional fuel oil and gas storage near gas turbine plants and near other users during high stress events, such as the long cold spell of 2016/2017.

 

Click on 2018 Forecast Data, 2018 - 2027

https://www.iso-ne.com/system-planning/system-forecasting/load-fore...

 

See page 20 of URL

https://www.iso-ne.com/static-assets/documents/2018/02/02272018_pr_...

Energy Efficiency

 

The US has had near-constant electricity generation at about 4000 TWh/y, with average real GDP growth at about 2%/y, for about 10 years. That 2% was due to 1) improvements in electricity generation and 2) improvements to subsequent consumption, i.e., improved energy efficiency.

 

New England likely is as virtuous as the US. It likely also had about a 2% improvement. Any claim made by the six NE states in excess of 1.5 - 2% for improved EE would be highly suspect, as that would leave less than 0 - 0.5% for generation improvements. See table 3A and page 20 of URL.

https://www.iso-ne.com/static-assets/documents/2018/02/02272018_pr_...

https://www.iso-ne.com/static-assets/documents/2018/04/eef2018_fina...

https://www.iso-ne.com/static-assets/documents/2018/04/a2_new_engla...

 

Table 3A/year

2017

2026

2030

GWh

GWh

GWh

Grid load, no PV and no EE

141000

153000

160000

Grid load growth, compounded, %/y

1.06

0.95

Less solar, BTM

-2276

-4575

-8042

Solar growth, compounded, %/y

10.20

10.20

138724

148425

151958

Prior energy efficiency, includes 2017

-15000

Added EE, 9 years, 2018 - 2026

-18302

Total EE, includes 2026

-33302

Added EE, 4 years, 2027 - 2030

-5000

Total EE, includes 2030

-38302

ISO-NE consumption. See URL

123724

115123

113656

.

Heat pumps, assumed

0

2000

4000

Electric vehicles, assumed

0

7000

15000

Consumption, with HP and EV

123724

124123

132656

Difference

11456

13736

Estimated Heat Pump and Electric Vehicle Implementation

Table 4 shows the estimated number of heat pumps installed (about 750000 in 2026), and estimated EVs on the road (about 1.35 million in 2026), and the estimated electricity fed to grid, kWh, for each HP and EV.

https://www.iso-ne.com/static-assets/documents/2018/02/02272018_pr_...

 

Table 4/year

2026

2030

Generation fed to grid for HPs, GWh/y

2000

4000

Generation fed to grid, kWh/y/HP

2500 kWh/y x 1.075

2688

2688

Heat pumps installed

744186

1488372

Generation fed to grid for EVs, GWh/y

7000

15000

Generation fed to grid, kWh/y/EV

12000 mi x 0.350 x 1.15 x 1.075

5192

5192

EVs on the road

 

1348163

2888921

Caveat Regarding Enthusiastic Energy Efficiency Calculations

- The calculations performed by state entities regarding energy efficiency savings are not uniform from state to state

- The estimates by state entities likely are on the high side to "prove" to voters and legislators the effectiveness of EE programs to justify perpetuating them. See Note

- It is somewhat like having the fox determining the combination of the lock on the chicken coop.

- ISO-NE relying on those EE calculations regarding grid planning may be unwise, i.e., how good are these EE numbers provided by the states? 

http://www.synapse-energy.com/sites/default/files/New-Englands-Shri...

NOTE: Efficiency Vermont was claiming annual energy cost savings for heat pumps that were FOUR TO NINE times greater than in the real world, as proven by a VT-DPS sponsored survey of existing HP installations.

 

- Savings per Efficiency Vermont, $865 - $1842/y

- Savings per the VT-DPS survey about $200/HP/y.

- Those savings were reported by Efficiency Vermont in its annual reports to get its budgets approved and perpetuate its programs,

See URLs and Appendix

 

http://www.windtaskforce.org/profiles/blogs/fact-checking-regarding...

https://www.iso-ne.com/static-assets/documents/2018/02/02272018_pr_...

APPENDIX 1

Increased Renewables per Capita Leads to Higher Household Electric Rates

 

The below graph shows countries with high levels of wind, solar, etc., also have high levels of household electric rates.

 

Politicians and bureaucrats find ways to place the cost burden of renewables (such as subsidies, grants, taxes, fees and surcharges) mostly on households, but give a free pass to the industrial and commercial sectors low for "competitive reasons"

 

Industry and commerce are vastly better organized and have vastly more political clout, and are much less easily swayed/bamboozled/conned than households. 

APPENDIX 2

"Fossil fuels are essential for making wind turbines, as Robert Wilson explains in Can You Make a Wind Turbine Without Fossil Fuels?"

"Oil is used from start to finish; from mining to crushing ore and smelting it; to delivery to the supply chain fabrication plants for the 8,000 parts in a turbine; to the final delivery to the site and erection.

Cement trucks drive to the delivery site over roads built by diesel powered road equipment.

The roads are paved with asphalt made from refinery tar.

Fossil-made cement and steel rebar is required for the wind turbine foundations.

Diesel trucks haul the components of the turbine to the installation place, and diesel cranes lift the turbine sections and 8,000 parts upward.

There are no electric blast furnaces, only fossil fueled ones to make cement and most steel.

There are no electric mining trucks, electric long haul trucks to deliver the 8,000 parts made all over the world, nor electric cement trucks, electric cranes, etc.

That means, even if a wind turbine could generate enough energy to replicate itself, it wouldn’t matter, the A-to-Z process would need to be electrified."

 

"Not only would windmills have to generate enough power to reproduce themselves, but they have to make enough power above and beyond that to fuel the rest of civilization.

Think of the energy to make the cement and steel of a 300-foot tower with three 150-foot rotor blades sweeping an acre of air at 150 miles per hour. 

The turbine housing alone weighs over 56 tons, the blade assembly 36 tons, and the whole tower assembly over 163 tons. 

Florida Power & Light says a typical turbine site is a 42 by 42 foot area with a 30-foot hole filled with tons of steel rebar-reinforced concrete; about 1,250 tons of foundation to hold the 300-foot tower in place (per Rosenbloom)."

 

APPENDIX 3

Wind and Solar Conditions in New England 

New England has highly variable weather and low-medium quality wind and solar conditions. See NREL wind map and NREL solar map.

 

https://www.nrel.gov/gis/images/100m_wind/awstwspd100onoff3-1.jpg

https://www.nrel.gov/gis/images/solar/national_photovoltaic_2009-01...

 

Wind:

- Wind electricity is zero about 30% of the hours of the year (it takes a wind speed of about 7 mph to start the rotors)

- Wind is minimal most early mornings and most late afternoons/early evenings (peak demand hours), especially during summer

- Wind often is minimal 5 - 7 days in a row in summer and winter, as proven by ISO-NE real-time generation data.

http://www.windtaskforce.org/profiles/blogs/daily-shifting-of-wind-...

- About 60% is generated at night, when demand is much less than during the late afternoons/early evenings

- About 60% is generated in winter.

- During winter, the best wind month is up to 2.5 times the worst summer month

- New England has the lowest capacity factor (about 0.262) of any US region, except the US South. See URL.

https://www.eia.gov/todayinenergy/detail.php?id=20112

 

Solar:

- Solar electricity is strictly a midday affair.

- It is zero about 65% of the hours of the year, mostly at night.

- It often is minimal 5 - 7 days in a row in summer and in winter, as proven by ISO-NE real-time generation data.

http://www.windtaskforce.org/profiles/blogs/daily-shifting-of-wind-...

- It is minimal early mornings and late afternoons/early evenings

- It is minimal much of the winter months

- It is minimal for several days with snow and ice on most of the panels.

- It varies with variable cloudiness, which would excessively disturb distribution grids with many solar systems, as happens in southern California and southern Germany on a daily basis. Utilities use batteries to stabilize their grids.

- During summer, the best solar month is up to 4 times the worst winter month; that ratio is 6 in Germany.

- New England has the lowest capacity factor (about 0.145, under ideal conditions) of any region in the US, except some parts of the US Northwest.

 

NOTE: Even if the NE grid had large capacity connections with Canada and New York, any major NE wind lull and any major NE snowfall likely would affect the entire US northeast, i.e., relying on neighboring grids to "help-out" likely would not be prudent strategy.

 

Wind Plus Solar:

ISO-NE publishes the minute-by-minute outputs off various energy sources contributing their electricity to the grid.

All one has to do is add the wind and solar and one comes rapidly to the conclusion both are minimal many hours of the year, at any time during the year.

 

- Wind plus solar production could be minimal for 5 - 7 days in summer and in winter, especially with snow and ice on most of the panels, as frequently happens during December, January and February, as proven by ISO-NE real-time generation data.

http://www.windtaskforce.org/profiles/blogs/daily-shifting-of-wind-...

 

If we were to rely on wind and solar for most of our electricity, massive energy storage systems (a few hundred GWh-scale for Vermont, multiple TWh-scale for NE) would be required to cover multi-day wind lulls, multi-day overcast/snowy periods, and seasonal variations. See URLs.

 

Wind and solar cannot ever be expected to charge New England’s EVs, so people can get to work the next day, unless backed up by several TWh of storage, because wind/solar lulls can occur for 5 - 7 days in a row, in summer and in winter. BTW, the turnkey capital cost of one TWH of storage (delivered as AC to the grid) is about $400 billion.

 

http://www.windtaskforce.org/profiles/blogs/wind-and-solar-energy-l...

http://www.windtaskforce.org/profiles/blogs/vermont-example-of-elec...

http://www.windtaskforce.org/profiles/blogs/seasonal-pumped-hydro-s...

http://www.windtaskforce.org/profiles/blogs/electricity-storage-to-...

http://www.windtaskforce.org/profiles/blogs/pumped-storage-hydro-in...

http://www.windtaskforce.org/profiles/blogs/wind-and-solar-hype-ver...

 

APPENDIX 4

High Levels of Wind and Solar

 

High levels of wind and solar, say 60% of NE grid annual load (the rest supplied by other sources), could not ever stand on their own, without the NE grid having:

 

- Much more robust connections to nearby grids (Canada, New York State), plus

- Gas turbine plants and reservoir/run-of-river hydro plants that could quickly vary their outputs to compensate for the quickly varying outputs of wind and solar, including very lowoutputs of wind and solar, which occur at random, at least 30% of the hours of the year, according to minute-by-minute generation data posted by ISO-NE.

 

If high levels of wind and solar were built out after a few decades, and the gas turbine, nuclear, coal and oil plants were closed down (according to RE proponent wishes), and with existing connections to nearby grids, and with existing reservoir/run-of-river hydro plants, and with existing other sources, the NE grid would require 6 - 8 TWh of storage to cover 5 to 7 day wind/solar lulls, which occur at random, and to cover seasonal variations (storing wind when it is more plentiful during fall, winter and spring, and when solar is more plentiful in summer, so more of their electricity would be available in summer when wind usually is at very low levels). See URLs.

 

That storage would need to have a minimal level at all times (about 10 days of demand coverage), to cover multi-day, scheduled and unscheduled equipment and system outages and unusual multi-day weather events, such as a big snow fall covering the solar panels andminimal wind.

 

- One TWh of storage costs about $400 billion, at $400/kWh, or $100 billion at a Holy Grail $100/kWh.

- Any electricity passing through storage has about a 20% loss, on a high voltage AC-to-high voltage AC basis, to be made up by additional wind, solar and other generation.

- Any electricity fed to EVs and plug-in hybrids has about a 20% charging and resting loss, from wall meter to “in battery”, as indicated by the vehicle meter, to be made up by additional wind, solar, and other generation. See URLs.

 

http://www.windtaskforce.org/profiles/blogs/tesla-model-3-long-term...

 http://www.windtaskforce.org/profiles/blogs/daily-shifting-of-wind-...

http://www.windtaskforce.org/profiles/blogs/new-england-will-need-t...

http://www.windtaskforce.org/profiles/blogs/vermont-example-of-elec...;

 

APPENDIX 5

Hydro-Quebec Electricity Generation and Purchases: Google this URL for the 2017 facts. The H-Q electricity supply is an order of magnitude cleaner than the Vermont supply.
http://www.hydroquebec.com/sustainable-development/energy-environme...

 

Table 5/H-Q

2017

GWh

Hydropower generated 

177091

Purchased

44006

- Hydro

31610

- Wind

9634

- Biomass and waste reclamation 

2021

- Other

741

Total RE generated and purchased

221097

 

NOTE: Gentilly-2 nuclear generating station, plus three thermal generating stations (Tracy, La Citière and Cadillac) were shut down.

 

Hydro-Quebec Export Electricity: H-Q net exports were 34.4 TWh/y in 2017; provided 27% of H-Q net income, or $780 million, i.e., very profitable.

 

H-Q export revenue was $1,651 million in 2017, or 1641/34.4 = 4.8 c/kWh.

See page 24 of Annual Report URL.

This is for a mix of old and new contracts.

Revenue = 1641

Net profit = 780

Cost = 1641 - 780 = 861

Average cost of H-Q generation = 861/34.4 = 2.5 c/kWh

 

GMP buys H-Q electricity, at the Vermont border, for 5.549 c/kWh, under a recent contract. GMP buys at 5.549 c/kWh, per GMP spreadsheet titled “GMP Test Year Power Supply Costs filed as VPSB Docket No: Attachment D, Schedule 2, April 14, 2017”.

H-Q is eager to sell more of its surplus electricity to New England and New York.

 

That is at least 50% less than ridgeline wind and large-scale field-mounted solar, which are heavily subsidized to make their electricity appear to be less costly than reality. 

 

GMP sells to me at 19 c/kWh, per rate schedule. Consumers pricing for electricity is highly political. That is implemented by rate setting, taxes, fees, surcharges, etc., mostly on household electric bills, as in Denmark and Germany, etc. The rate setting is influenced by protecting “RE policy objectives”, which include highly subsidized, expensive microgrids, islanding, batteries and net metered solar and heat pumps.

 

http://www.hydroquebec.com/sustainable-development/energy-environme...

http://news.hydroquebec.com/en/press-releases/1338/annual-report-2917/

http://www.hydroquebec.com/data/documents-donnees/pdf/annual-report...

http://www.windtaskforce.org/profiles/blogs/green-mountain-power-co...

http://www.windtaskforce.org/profiles/blogs/increased-canadian-hydr...

APPENDIX 6

The Vermont Heat Pump Promotion Troika

 

1) GMP: Kristin Carlson, GMP's vice president for strategic and external affairs, said in an email that the utility has now installed 1,125 heat pumps.

 

-GMP arranges for the installation with an Efficiency Vermont-approved contractor.

- The contractor chooses the heat pump brand and model; brands include Daikin, Fujitsu, and Mitsubishi, with outputs ranging from 9,000 Btu/h to 18,000 Btu/h.

- GMP loan at an interest rate is 10.74%/y. That appears to be a usury rate!

- GMP says that payments will range from $49 to $81 per month, depending on the model of heat pump that's installed.

- Maintenance is included; no mention of parts or outage service calls

- That doesn't include the electricity required to run the unit.

- Should a homeowner sell the house before the loan is repaid, GMP says it can offer a buy-out price for the heat pump, or the new owner could pick up the payments.

http://www.greenbuildingadvisor.com/blogs/dept/green-building-news/...

 

Table 6

Small

Large

Average

ccHP capacity, Btu/h

9000

18000

13500

ccHP turnkey cost, $

 4575

7230

5903

Monthly payment at 10.74% for 15y, $

 49

81

65

Annual payment, $

 588

972

780

 

Annual Cost Summary

 

Table 7

No ccHP

With ccHP

Fuel oil price, $/gallon

2.70

2.70

Electricity price, $/kWh

0.16

Fuel oil, gal/y

660

421

Fuel oil displaced by ccHP, gal/y

239

Fuel oil cost, $/y

1782

1137

Electricity consumed, kWh/y

2387

Electricity cost, $/y

382

Total energy   cost, $/y

1782

1519

Energy cost saving, $/y

263

GMP loan, average cost, $/y^

780

Amortize back-up system, $/y*

792

792

Total cost, $/y

2574

3091

LOSS, $/y

517

.

Not Counted

Maintenance contract, ccHP, no parts, $/y

0

Outage calls, ccHP, no parts, $/call

0

Maintenance contract, back-up, no parts, $/y

250

250

Outage calls, back-up, no parts, $/call

150

150

 

* Amortize $10,000 back-up system at 5% for 20 y

^ GMP loan, average cost = (49 + 81)/2 x 12 = $780/y, includes (unspecified) ccHP maintenance. Does that include ccHP outage calls?

NOTE: With a carbon tax on fuel oil the scale can be tipped in favor of ccHPs.

 

2) Efficiency Vermont: According to a fact sheet at Efficiency Vermont, a homeowner would save:

 

- $1,842/y by shifting 80% of the heating load away from electric resistance heat to a cold-climate heat pump.

- Propane users would save $1,268/y.

- Fuel oil users would save $865/y.

- The “fact sheet” (fiction sheet?) is no longer accessible!
http://www.greenbuildingadvisor.com/blogs/dept/green-building-news/...

 

3) VPIRG, an RE Lobby: VPIRG, a booster of renewable energy, mostly financed by Vermont RE businesses, estimated the annual savings of a heat pump at $1000 to $1500 on a $3000 household heating bill. It appears, VPIRG grabbed a number out of the air, because it looked good.

 

Views: 430

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Willem Post on January 2, 2019 at 7:15pm

Dan,

I wrote several articles on that subject.

The big problem is it is all too expensive, EVEN WITH GRANTS PLUS SUBSIDIES 

At present there is no way the whole set up of solar and batteries would be econically viable, if all costs are properly allocated, instead of fudged.

GMP has been touting this, but it gets to add a lot of the cost to the rate base so everyone pays.

All that is decided behind closed doors, as part of advancing policy objectives.

There is no way GMP would do this at a loss.

Same thing with heat pumps and Tesla Powerwalls 

Costs are shifted, and then GMP can say see it pays, and the believing gullibles out there say amen

Comment by Dan McKay on January 2, 2019 at 6:22pm

So, what I'm hearing is microgrids( micro, as in small scale ) are about to explode onto the scene and a major transformation in the electricity market is imminent. Microgrids are a geographically defined area utilizing generation resources, distribution  lines and storage to supply power locally and behind the so-called ISO-NE meter. Ideally,instead of having the excess spill over into the regional transmission system, the excess will charge storage batteries. This storage will be used at peaking times to smooth out loads. The long distance problem of generation to load will not exist. 

Generation resources presently favored are wind and solar, but small scale modular nukes might work as well. Zero Carbon is desirable.  
The initial microgrids will use excess storage to shave peak loading occurring in the regional grid enabling them to receive revenue from the reserve markets as well as reducing their costs associated with the capacity market. A good read about this is from Vermont;s Green Mountain Power Stafford Hill microgrid in Rutland, Vermont,,,,,,,,,,,,https://www.cleanegroup.org/wp-content/uploads/SAND2017-6164.pdf
What do you think ? Will it work ? I'm sure it will be front and center in this year's legislative session.
Comment by Willem Post on January 2, 2019 at 5:46pm

Dan,

Table 3 shows wind plus solar before and after the meter would be about 50 TWh

Comment by Willem Post on January 2, 2019 at 5:42pm

Dan,

It is important to make the point there is no equivalence between variable, intermittent wind and solar and the traditional energy sources.

The traditionals have proven for decades they can stand on their own, but wind and solar, wind and sun dependent, will never prove that.

They can only exist if propped by the traditionals or if seasonal storage is present

one TWh of battery storage costs about $400 billion, at $400/ kWh, turnkey

NE would need at least 8 TWh of seasonal storage, if wind and solar were 60 plus percent on the grid, i.e., about 80 TWh

Comment by Willem Post on January 2, 2019 at 5:28pm

Hi Long Islander,

i agree, Sierra has made baseless endorsements to get money and other favors from wind developers.

A grand deception perpetrated on the naive public to soften them up, so misdoers can get away with murder.

A prostitute takes money for a service, but this worse

Comment by Willem Post on January 2, 2019 at 5:20pm

Hi Dan,

Please elaborate on these two points.

Do you have the latest caps for each state?

Integrating a few nuclear plants into a grid would be far less costly than tens of thousands of mom and pap PV solar systems and dozens of wind systems, mostly in northern Maine. Getting that wind electricity to south NE population centers has proven to be a major NIMBY challenge.

Comment by Penny Gray on January 2, 2019 at 5:11pm

Any state energy policy that doesn't employ the use of natural gas as a bridge to carry us until small modular reactors come on line is moronic.

Comment by Dan McKay on January 2, 2019 at 12:47pm

Good amount of work, Willem. Two points to consider, 1, State caps on carbon emissions and impact on fossil fuel plants going forward. 2. Impact of distributed generation, a growing darling of the elites.

Comment by Long Islander on January 2, 2019 at 12:26pm

Here's a piece in the Buffalo News from the other day on Sierra and Apex, the company where former Maine Wind Industry Initiative director Paul Williamson works for these days. The piece is from the Town Supervisor of Somerset, NY.

I was perplexed when the Sierra Club Atlantic Chapter recently announced that it had voted to “unanimously and formally endorse the proposed Lighthouse Wind project.” The Sierra Club went even further to state that the project is “environmentally sound.”
This seemed very suspicious to me because an application with a final siting plan has not even been filed and not a single state nor federal agency has approved any of the currently proposed environmental, economic or health impact studies submitted by Apex.

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."