FAIRLESS HILLS, Pa. — Last month, Gamesa, a major maker of components for…
This is scarey. If Malcolm is really involved in all of this, and it doesn't sound good (after reading the Portland Herald article in the link below), I am sure he will have some big legal expenses if he doesn't wind up losing his company. To think he and Cianbro would be developing an industrial wind farm on Greenland Ridge overlooking East Grand Lake in Danforth, Maine, makes me wonder what else is going on.
I wonder what other sites these folks were considering. Malcom's company…
ContinueAdded by bill beavers on September 29, 2012 at 11:00am — No Comments
Check out these articles, and then visit the Keep It Grand website (http://www.keepitgrand.org).
Looks like Malcolm French and Cianbro are in for some tough times with Greenland Ridge project,
or at least will be experiencing some delays while the legal issues get sorted out.…
ContinueAdded by bill beavers on September 28, 2012 at 12:24pm — No Comments
After many months the UMPI website is declaring:
"Repairs are complete and the wind turbine is once again
spinning. In addition the data gathering system for the
turbine has been restored and the live wind data is currently
…
ContinueAdded by Harrison Roper on September 27, 2012 at 6:02pm — 1 Comment
The UMPI turbine seems to be working! At 4:00 pm today (9/26/12) the website reports rotor rpm at 18.1; generator rpm 28.6; power 354KW, and a 30-hour net gain of about 4500 KWH. This is the largest net gain reported in months. The turbine's installed capacity is 600 KW, or 600X24H=14,400 KWH per day. That's a Capacity Factor of .25 .
Harry Roper Houlton/Danforth
Added by Harrison Roper on September 26, 2012 at 4:34pm — 1 Comment
Crash Barry, Jennifer Bolduc, Amity Beane, Cathy and Allan Ackley, Terri and Norman Mitchell, Chad Luce myself and others have agreed to help in signature collecting.
Who can write the wording? Who wants to see a citizen's petition against WIND?
I see it as one way of saving/stalling the destruction of UT.
this document i have explaining the true logistics of such an operation (written by Maine People's Alliance…
ContinueAdded by alice mckay barnett on September 26, 2012 at 9:45am — 4 Comments
The UMPI turbine is continuing its partial data reporting. The wind speed seems to vary, and the rotor and generator rpm vary also, but the power being produced has been a steady minus figure for five days, usually
- 0.1 KW. I check this daily.
Net power produced has dropped about 38 kwh in that time. "Power" reported was 25,122 KWH Sept. 19;…
ContinueAdded by Harrison Roper on September 24, 2012 at 5:56pm — 1 Comment
Dear Fellow Wind Fighters:
I am asking for your help.
We, in the town of Forest, St. Croix County,WI have been fighting against an industrial wind project for two years. The Highland Wind Farm--41 towers 497 foot tall 2.5 MW turbines (likely Nordex N100)--is on the map for our small township. We stopped the project on a local level about one year ago when we recalled the town board based on open records that showed evidence of open meeting violations and possible…
ContinueAdded by Barry @ SaveOurSeaShore on September 24, 2012 at 9:29am — No Comments
Added by Michele Currivan on September 21, 2012 at 10:01pm — 3 Comments
http://www.postbulletin.com/news/stories/display.php?id=1508970
By Brett Boese The Post-Bulletin, Rochester MN Minnesota
Rule Part 7854.1300, Subpart 3. The Minnesota Public Utilities Commission can revoke a site permit if it's determined that: • The applicant knowingly made a false statement in the application orin accompanying statements or studies required of the applicant, if a…
ContinueAdded by Rick Conrad on September 21, 2012 at 5:30pm — No Comments
9/21/12 - UMPI turbine website reports it is ACTUALLY WORKIN , after 180 days.
As of 1:30 PM today, the "live turbine data" web page reports: wind at 7.6 mph, blade pitch at 2 degrees, rotor at 28.8 rpm, 25,000 kwh produced, generator temperature 21 C, power producrion minus 0.1kw, 412 Volts. The bar chart is unchanged and (not labled) it is about 17 months old. The power produced is a puzzle, since it gives no dates. The cute…
ContinueAdded by Harrison Roper on September 21, 2012 at 1:21pm — No Comments
Still many Lewes turbine questions hanging
They say they were upgrading the Turbine, but fact is it was destroyed by Lightning.
Cape Gazette By Jerry Lechliter | Sep 21, 2012
When something happens that might…
ContinueAdded by Barry @ SaveOurSeaShore on September 21, 2012 at 10:30am — 3 Comments
FAIRLESS HILLS, Pa. — Last month, Gamesa, a major maker of components for…
Added by Ellin Beltz on September 20, 2012 at 1:06pm — No Comments
Rather, they are referring to how Angus King and his ilk are sucking the lifeblood out of the U.S. treasury.
To say nothing of Maine ratepayers and Maine's wild lands he once…
ContinueAdded by Whetstone_Willy on September 19, 2012 at 4:00pm — 1 Comment
Added by Whetstone_Willy on September 19, 2012 at 3:01pm — No Comments
After many months, the "live wind data" page of the UMPI turbine is reporting something! But the turbine is still not generating power.Iin a 12 mph wind, rotor rpm and generator rpm are zero, and power output is MINUS .4 kWh. That's 400 watts of grid power, being used to keep the machine working. At least something is working, and there is an effort to get it all…
ContinueAdded by Harrison Roper on September 19, 2012 at 1:36pm — 1 Comment
Added by Long Islander on September 18, 2012 at 9:00am — 1 Comment
SEPTEMBER 17, 2012 4:00 A.M.
The Cost of Wind-Energy Jobs
The “our industry creates jobs” argument is the last refuge of a subsidy seeker.…
ContinueAdded by Long Islander on September 17, 2012 at 9:59am — 1 Comment
Angus King's partner in Independence Wind, Robert Gardiner, sent the following letter to the Governor's Task Force on Wind Power's chairman Alec Giffen. Gardiner's suggestions about preventing objections based on scenic impact and the unrebuttable presumption about wind power's benefits were incorporated into the law. At the time King and Gardiner already had their MET towers up in Roxbury, and they needed to bulletproof the project against it's drastic impacts on the scenic character of…
ContinueAdded by Steve Thurston on September 16, 2012 at 12:30pm — 2 Comments
The following article outlines some of the best information regarding the Wind Industry throughout the world. I think it is imperative we know all the facts, and where to find data to back them up. It is quite a read, but well worth it.…
ContinueAdded by Jim Lutz on September 16, 2012 at 10:56am — No Comments
This may or may not be posted as a comment in the paper. They are screening and it is "awaiting Moderation".
I don't begrudge anyone from starting up a new business that they think might improve the quality of life, create jobs, make a profit, improve technology nad make Maine a leader. But Industrial Wind does nothing of those things. Gov. King's own words prove it. "I didn't see how I could credibly talk about energy in Maine (as a Senate candidate) while I was in a…
Added by Jim Lutz on September 16, 2012 at 10:13am — No Comments
2025
2024
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
1999
U.S. Sen Angus King
Maine as Third World Country:
CMP Transmission Rate Skyrockets 19.6% Due to Wind Power
Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.
Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT
******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********
(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/
Not yet a member?
Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?
We have the facts on our side. We have the truth on our side. All we need now is YOU.
“First they ignore you, then they laugh at you, then they fight you, then you win.”
-- Mahatma Gandhi
"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi
Task Force membership is free. Please sign up today!
Hannah Pingree - Director of Maine's Office of Innovation and the Future
"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."
https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/
© 2025 Created by Webmaster.
Powered by