World's first floating wind system Hywind Scotland faces shutdown for 'heavy maintenance'

World's first floating wind system Hywind Scotland faces shutdown for 'heavy maintenance'

https://www.windtaskforce.org/profiles/blogs/world-s-first-floating...

.

Norway's Equinor confirms component changes needed on all five Siemens Gamesa 6MW machines operating since 2017

.

One of five 6MW Siemens Gamesa being towed out to Hywind Scotland in 2017
One of five 6MW Siemens Gamesa being towed out to Hywind Scotland in 2017

Norwegian energy giant Equinor will temporarily remove all five floating wind turbines from the pioneering Hywind Scotland array later this year after discovering a need for “heavy maintenance” on the Siemens Gamesa machines deployed there, Recharge has learned.

.

The 6MW turbines will be towed back to Wergeland on the west coast of Norway, as part of a maintenance program that is likely to take around four months and will disrupt power output from the project operating 24 km off Peterhead since 2017.

.

All units will be reconnected back on the Hywind Scotland site when the maintenance is complete, a spokesman for the Norwegian company confirmed.

.
The work will involve changing various components, including bearings on the turbines, as well as increased routine maintenance in the future.
.
“What we see from operational data, such as excessive stresses on bearings, points to the need for… heavy maintenance on the turbines,” 
.
The cost of towing from Scotland to Norway, repairs and lack of production, towing from Norway to Scotland and reconnecting, will be significant.
.
If such wind turbines were installed in Maine, round-trip towing, and lack of production would be much greater.

Views: 11

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2025   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service