Do Maine Lawmakers Have the Best Interests for the Maine People? There is a Way to Find Out.

The U.S. Energy Information Administration (EIA) recorded the 2022 total Maine electric sales at 11,875,708 megawatt-hours

The EIA record shows Maine has generation capabilities from renewables at 11,257476 megawatt-hours.
This means if Maine would qualify just one in-state hydropower plant over a 100 megawatt capacity as renewable, Maine could be 100% renewable by retiring renewable energy credits with all credits going towards Maine goals.
This also means if the Maine legislators will not guide the state into this path, they are compromised by someone(s) .

Views: 36

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Willem Post on February 28, 2024 at 12:51pm

If the US had more wind and solar at very high cost/kWh, that would be inflationary and make the US even less uncompetitive on world markets, which is the intent of Europe, which imports its energy and materials.

WORLD’s LARGEST OFFSHORE WIND SYSTEM DEVELOPER ABANDONS TWO MAJOR US PROJECTS AS WIND BUST CONTINUES  
https://www.windtaskforce.org/profiles/blogs/world-s-largest-offsho...

EXCERPT

New York State had signed contracts with EU big wind companies for four offshore wind projects
Sometime later, the companies were trying to coerce an additional $25.35 billion (per Wind Watch) from New York ratepayers and taxpayers over at least 20 years, because they had bid at lower prices than they should have.
New York State denied the request on October 12, 2023; “a deal is a deal”, said the Commissioner 

Owners want a return on investment of at least 10%/y, if bank loans for risky projects are 6.5%/y, and project cost inflation and uncertainties are high 
The about 3.5% is a minimum for all the years of hassles of designing, building, erecting, and paperwork of a project
.
The project prices, with no subsidies, would be about two times the agreed contract price, paid by Utilities to owners.
The reduction is due to US subsidies provided, per various US laws
All contractors had bid too low. When they realized there would be huge losses, they asked for higher contract prices.
It looks like the contract prices will need to be at least $150/MWh, for contractors to make money. Those contract prices would be at least 60% higher than in 2021
.
Oersted, Denmark, Sunrise wind, contract price $110.37/MWh, contractor needs $139.99/MWh, a 27% increase
Equinor, Norway, Empire 1 wind, contract price $118.38/MWh, contractor needs $159.64/MWh, a 35% increase
Equinor, Norway, Empire 2 wind, contract price $107.50/MWh, contractor needs $177.84/MWh, a 66% increase
Equinor, Norway, Beacon Wind, contract price $118.00/MWh, contractor needs $190.82/MWh, a 62% increase
https://www.windtaskforce.org/profiles/blogs/liars-lies-exposed-as-...
.
NOTE: Empire Wind 2, 1260 MW, near Long- Island, was cancelled.
https://www.reuters.com/business/energy/equinor-bp-cancel-contract-...
.
Offshore Cancellations in Massachusetts, Connecticut and Rhode Island
.
BP (BP.L) and Oersted (ORSTED.CO) have announced hefty writedowns , and US offshore project cancellations, in recent days, in the face of high inflation, high interest rates, and lack of the timely availability of specialized ships.
.
In Rhode Island, in March 2023, a procurement for offshore wind drew only one bidder – an 884 MW proposal from Eversource and Ørsted.
In August, Ørsted CEO Mads Nipper warned the company could walk away from unprofitable projects in the US amid the turbulence in pricing and supply chain issues.
.
Avangrid, a Spanish company, in September 2022, walked away from its 804 MW Park City wind project, planned for off the coast of Martha’s Vineyard. It was no longer feasible at the 2019 contract price agreed with Connecticut.
At the time, the company said, inflation, higher interest rates and supply chain issues made the agreed price of $79.83 per MWh unprofitable.
In July 2023, Avangrid also walked away from its 1200 MW Commonwealth Wind project for Massachusetts.
The two projects became so unprofitable, it made better financial sense for Avangrid to pay $48, Massachusetts + $16, Connecticut = $64 million in walk-away penalties, rather than face much higher costs for building the project, with no prospect of a profit. 
.
SHELL: LONDON, Nov 2 (Reuters) – Shell’s CFO said on Thursday, the firm had abandoned a power purchase agreement (PPA), at contract price of $76.73/MWh, for the planned 2400 MW South Coast offshore wind project, off the coast of Massachusetts, agreeing to pay a $60 million walk-away penalty, rather than face much higher costs for building the project, with no prospect of a profit. 
https://ctexaminer.com/2023/10/03/avangrid-cancels-park-city-wind-c...

Comment by Willem Post on February 28, 2024 at 12:38pm

Hertz has an EV fleet, and sold most of it at very low prices, because nobody wanted to rent them.

Nowadays, most EVs are bought under a lease, by upper class folks, because they make too much money to qualify for the EV tax credit

I read a lot of great comments.

We have to vote Trump in by a landslide, so all these idiotic self-serving politicians get wiped out all over the country, and out of the Congress, so Trump can unto the Biden damage, especially at the border, because every illegal is a Democrat vote.

DEPORT ALL THE ILLEGALS, INCLUDING ILLEGAL CRIMINALS

.

Wow, it does not get much better than this.
.
The Washington, DC, perpetrators of these EV follies want to be re-elected to have power over you, to use more of your money, to do more of the same follies, “for as long as it takes”, while they debilitate the US with open borders and over-top-war mongering
.
All that is even more true, because the EV charging stations are unreliable, often are out of service, and to top it of, EVs are unreliable, have high repair bills, and have poor range in cold weather, especially when having more than one passenger, and some cargo, and going uphill, on cold, snowy days, as in New England, etc.
.
Currently, the vast majority of charging infrastructure is concentrated in more densely populated coastal areas, as opposed to more rural areas of the country, according to the Department of Energy (DOE).
.
Almost all people in rural areas, often with dirt roads, and snow and ice and cold, and longer distances, are definitely not giving up their pick-ups and SUVs to “switch to EVs”, especially in impoverished states, such as Maine and Vermont. Their Socialist governments lost all sense of reality, and think money grows on trees.

Insurance Costs Very High: Because EVs are much more costly to repair, EV insurance rates are about 3 times the rate of gasoline vehicles, completely wiping out any energy savings.
.
Monthly Payments Very High: Because EVs are more expensive and interest rates are high, monthly payments are much higher than for gasoline cars, completely wiping out any benefits of tax credit subsidies.
.
Useful Service Life Very Short: EV useful service lives are very short, usually at most 8 years.
No one in his/her right mind, would spend at least $15,000 to $20,000 to replace a battery in an 8-y-old EV, which by then. would have lost almost all of its value, unlike a gasoline vehicle.
.
Charging Cost Very High: EV charging cost is very high on the road, usually at least 30 c/kWh, at home at least 20 c/kWh in New England
As a result, annual fuel cost savings are minimal, because EVs are driven fewer miles per year than gasoline cars, and the price of gasoline is about $3.20/gallon
.
Minimal CO2 Reduction: EVs driven, on average, about 72,000 miles for 8 years, according to various studies, do not reduce CO2 emissions compared to efficient gasoline vehicles driven the same miles, if CO2 evaluations are made on a mine to hazardous-waste landfill basis, and same-mile basis.
The useful service lives of gasoline cars is much longer than of EVs.
.
Range Usually Much Less Than Advertised:  EV owners experience much less range than advertised by EPA, especially with one or more passengers, with some luggage or a heavy load, cold weather, up and down hills, on wet/snowy dirt roads, hot weather, etc.
Teslas EVs, driven 75,000 to 80,000 miles, will have lost about 15 to 20% of battery capacity at end of year 8.
If traveling with one or more passengers, with some luggage, was a challenge on a longer trip, and even more of a challenge on a cold/snowy day, then an older EV, with an aging battery, has all that, and more, which is a good reason not to buy one.
.
Battery Aging a Serious Issue: If a new EV, it takes about 1.15 kWh to add a 1.0 kWh charge in the battery, plus, there is a loss of about 5% to get 1.0 kWh out of the battery to the drive train of the EV, etc. 
If a 5-y-old EV, it takes about 1.25 kWh to add 1.0 kWh charge in the battery, plus there is a loss of about 5.5% to get 1.0 kWh out of the battery
The older the EV, the greater the losses, plus the battery has lost capacity, the ability to do work and go the distance; all that is worse on a cold day, or hot day, heavy loads, and other adverse conditions.
.
Charging Batteries at Less than 32 F: If an EV owner parks at an airport, goes away for a few days or a week, upon return he/she may find the EV with an empty battery (if the battery had a somewhat low charge to begin with), if during that week the weather were below freezing, because the battery thermal management system, BTMS, will maintain battery temperature, until the battery is empty, then the battery freezes to 32F, or less. 
Charging would not be allowed, until the battery is warmed up in a garage.
In the future, with thousands of EVs at the airport, a percentage would have empty batteries. You would have to wait your turn to get a tow to the warm garage, get charged, pay up to $500, and be on your way, after 8 hours or so!!
.
Losing Value After 3 Years: Used EVs retain about 60% of their high original value, whereas gasoline vehicles retain at least 70% of their not so high original value, by the end of year 3.
Losing 40% of a $45,000 EV = $18,000
Losing 30% of an equivalent size, $35,000 gasoline vehicle = $10,500
The loss difference wipes out any tax credit subsidies. 
.
LEGISLATOR’s CHEVY BOLT CATCHES FIRE WHILE CHARGING ON DRIVEWAY IN VERMONT
https://www.windtaskforce.org/profiles/blogs/chevy-bolt-catches-fir...

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by