NEW MINE-MOUTH COAL ELECTRICITY LESS COSTLY, AVAILABLE NOW, NOT PIE IN THE SKY, LIKE EXPENSIVE FUSION AND SMALL MODULAR NUCLEAR

NEW MINE-MOUTH COAL ELECTRICITY LESS COSTLY, AVAILABLE NOW, NOT PIE IN THE SKY, LIKE EXPENSIVE FUSION AND SMALL MODULAR NUCLEAR 

https://www.windtaskforce.org/profiles/blogs/coal-electricity-less-costly-available-now-not-pie-in-the-sky

By Willem Post

 

Wind/Solar electricity is at least 3 times more expensive than coal electricity; a main reason Europe is castrating itself.

US utilities are forced to buy offshore wind electricity for about 15 cents/kWh.

That price would have been 30 cents/kWh, if no 50% subsidies.

 

Hidden Costs: These are the A-to-Z costs (windmill to land fill) almost all folks are kept ignorant about. 

At a future 25-30% W/S annual penetration on the grid, based on UK and German experience: 

- Onshore grid expansion/reinforcement to connect far-flung W/S systems, about 2 c/kWh

- A fleet of traditional power plants to quickly counteract W/S variable output, on a less than minute-by-minute basis, 24/7/365, which means more Btu/kWh, more CO2/kWh, more cost of about 2 c/kWh

- A fleet of traditional power plants to provide electricity during 1) low-wind periods, 2) high-wind periods, when rotors are locked in place, and 3) low solar periods during mornings, evenings, at night, snow/ice on panels, which means more Btu/kWh, more CO2/kWh, more cost of about 2 c/kWh

- Pay W/S system Owners for electricity they could have produced, if no curtailment, about 1 c/kWh

- Importing electricity at high prices, when W/S output is low, 1 c/kWh

- Exporting electricity at low prices, when W/S output is high, 1 c/kWh

- Disassembly on land and at sea, reprocessing and storing at hazardous waste sites, about 2 c/kWh

Total: 2 + 2 + 2 + 1 + 1 + 1 + 2 = 11 c/kWh

.

Offshore wind full cost of electricity FCOE = 30 c/kWh + 11 c/kWh = 41 c/kWh, no subsidies

Offshore wind full cost of electricity FCOE = 15 c/kWh + 11 c/kWh = 26 c/kWh, with equivalent of 50% subsidies

This compares with 7 c/kWh + 3 c/kWh = 10 c/kWh from existing gas, coal, nuclear, large reservoir hydro plants.

Some values increase due to inflation and as more W/S systems are added to the grid.

.

Such expensive W/S electricity would have made the US even less competitive in world markets.

Any US tariffs on the European/Chinese supply of W/S systems would greatly increase their turnkey capital costs/MW and their electricity costs/ kWh.

.

Here is an example of the lifetime cost of a coal plant

Coal gets very little direct subsidies in the US.

The key is running steadily at 90% output for 50 years, on average, i.e., base loaded.

.

Assume mine-mouth coal plant in Wyoming; 1800 MW; turnkey-cost $10 billion; life 50 y; Capacity factor 0.9; no direct subsidies; Wyoming coal, low-sulfur, no CO2 scrubbers needed; efficiency 0.4

Annual production = 1,800,000 kW x 8,766 h/y x 0.9 = 14,200,920,000 kWh

Coal heat value = 2000 lb/US ton x 8600 Btu/lb = 17,200,000 Btu/US ton

Year 1 coal cost = 14,200,920,000 kWh/y x (3412 Btu/kWh/0.4)/17,200,000 Btu/US ton x $15/US ton = $105,639,983/y

Year 1 O&M and other costs = 3 c/kWh. See Note.

 

Year 1 revenue, 14,200,920,000 kWh x $0.082kWh = $1,164,475,440/y

Payments to bank, $5 billion at 6% for 50 y; amortized at $317.2 million/y x 50 y = $15.86 billion

Owner investment, $5 billion at minimum of minimum of 10% for 50 y

Standard inflation of coal, electricity, O&M at 3.0 %/y

Year 1 electricity price $0.082kWh

Project cashflow for 50 years

Assume 20-y MACRS depreciation, if applicable

Assume no up-front tax credits; assume loan interest deduction from taxable income

.

Per google AI, the Owner's initial cash-on-cash yield starts at 6.31% in Year 1. Because the bank debt stays entirely static while operating profits increase via inflation, the cash yield crosses the 10.00% mark by Year 11 ($533.24 Million) and hits 47.52% by Year 50. This shifts the entire 50-year weighted return profile to a 10.77% exact IRR.

 

NOTE:

Fixed O&M (labor, maintenance, insurance, taxes, land lease)

Variable O&M (water, chemicals, lubricants, waste disposal)

Fixed + Variable, newer plants 2 c/kWh, older plants up to 4 c/kWh

.

Traditional Nuclear has similar economics; life 60 to 80 y; CF 0.9 in the US.

.

For perspective, China used 2204.62/2000 x 4300 = 4740 million US ton in 2024.

China and Germany have multiple ultra-super-critical, USC, coal plants with efficiencies of 45% (LHV), 42% (HHV)

https://www.sciencedirect.com/topics/engineering/ultrasupercritical-plant

Views: 133

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."