Massachusetts Officials Knew Offshore Wind Would Double Electric Rates

First, the land-based wind fiasco;  

.

In January 2009, Massachusetts set a clean energy goal to install 2,000 megawatts of land-based wind power capacity by the year 2020, enough power for 800,000 homes. Today, most of those projects have been removed or failed.  The state never built more than 100 megawatts of onshore wind projects.  

.

Massachusetts officials and state agencies had explicit warnings about the severe noise and regulatory violations of land-based commercial wind projects before building them. 

.

Internal documents later revealed that the Massachusetts semi-quasi Massachusetts Clean Energy Center and turbine manufacturers warned that early installations—like the notorious Falmouth project—would violate state noise regulations, yet warnings were withheld from local voters. 

.

Former Governor Charlie Baker eventually admitted to Congress in 2019 that the state "screwed up" the implementation. Maura Healey served as the Massachusetts Attorney General for almost the entirety of Republican Governor Charlie Baker's two terms in office.

.

Governor Maura Healey, who was attorney general during the screw-up, has faced criticism from political opponents and analysts who claim Massachusetts retired fossil fuel capacity and blocked natural gas pipelines before replacement renewable projects like offshore wind fully materialized, causing the high electricity rates. 

.

Last, the offshore wind fiasco 

.

Ten years after the land-based wind screw-up, Massachusetts set a goal for the Vineyard Wind 1 project to generate 800 megawatts of clean, renewable energy to power over 400,000 homes and businesses in New England. 

.

The project failed because the blades were defective and broke.  Again, officials failed in due diligence.

.

In the late 1990s, LM Glasfiber (now LM Wind Power) experienced serious stress cracking in wind turbine blades due to violent edgewise vibrations..

Rather than embedding internal sensors to prevent cracks, they advised installing external vibration detectors to shut down turbines during extreme oscillations and later added mechanical dampeners and edge modifications. 

.

General Electric (now GE Vernova) purchased LM Wind Power (formerly known as LM Glasfiber) for $1.65 billion. The acquisition was officially completed in the first half of 2017. 

.

The LM Wind Power facility in Gaspé, Quebec, manufactured 150 wind turbine blades for GE Vernova, the majority of which were designated for the Vineyard Wind 1 project. Following a July 2024 blade failure caused by a manufacturing defect, federal regulators ordered the removal and replacement of these Canadian-made blades.

.

The Vineyard Wind "torsion problem" in LM Wind Power blades (specifically the 107-meter models used in GE Vernova’s Haliade-X turbines) stems from massive, varying rotational and aerodynamic forces that cause classical torsional (twisting) failure.

.

After the Vineyard Wind blade failures, GE Vernova deployed a new safety monitoring algorithm that uses existing blade sensors to automatically trigger a safe, precautionary shutdown if it detects unusual stress or anomalies. 

.

Investigations revealed manufacturing deviations and adhesive bonding issues at GE’s Gaspé, Canada, plant, affecting 68 of 72 installed blades, which required extensive replacements. Investigations revealed allegations that plant "executives" falsified quality control testing data to prioritize production speed.  

Vineyard Wind filed a lawsuit against GE Vernova subsidiary GE Renewables in April 2026 in Massachusetts Superior Court.

.

AKA what happened in 1998 happened 25 years later in 2024.  

Déjà Vu  Vineyard Wind is producing less than half the power it was rated for.

.

Note: The Bureau of Safety and Environmental Enforcement (BSEE), a federal agency, has not completed the investigation of the Vineyard Wind blade failures. On July 10, 2026, federal officials changed the name of BSEE to the Marine Minerals Administration (MMA)..

.

Views: 104

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Dan McKay on August 11, 2026 at 5:15am

Massachusetts and other New England States decided Maine should become the onshore wind plantation for all of New England. Renewable Energy Credits provide overwhelming revenue for the wind developers. Rollins Wind chuga along making fistfuls of money from a long term contract, an offer the Maine PUC could not refuse. The enemies raising our electric bills and destroying the beauty of our state is beyond and within our borders.

Comment by Frank Haggerty on August 8, 2026 at 1:52pm
 Modeling indicates large offshore turbines produce low-frequency vibrations that could technically overlap with baleen whale communications; empirical field measurements confirm these sounds degrade rapidly with distance.
 
Offshore wind turbine farms are being planned and installed throughout the coastal areas of the global ocean. Noise concerns from these activities are typically framed within frequency bands of concern defined by governmental regulatory agencies
 
Scientific investigations by NOAA and independent researchers have linked military mid-frequency active sonar to mass whale strandings in the Pacific Ocean. Sonar terrifies deep-diving whales, triggering a rapid heart rate and abnormal dive behaviors that cause fatal decompression sickness (the bends) and organ hemorrhaging. 

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/