After many months the UMPI website is declaring:
"Repairs are complete and the wind turbine is once again
spinning. In addition the data gathering system for the
turbine has been restored and the live wind data is currently
…
ContinueAdded by Harrison Roper on September 27, 2012 at 6:02pm — 1 Comment
The UMPI turbine seems to be working! At 4:00 pm today (9/26/12) the website reports rotor rpm at 18.1; generator rpm 28.6; power 354KW, and a 30-hour net gain of about 4500 KWH. This is the largest net gain reported in months. The turbine's installed capacity is 600 KW, or 600X24H=14,400 KWH per day. That's a Capacity Factor of .25 .
Harry Roper Houlton/Danforth
Added by Harrison Roper on September 26, 2012 at 4:34pm — 1 Comment
The UMPI turbine is continuing its partial data reporting. The wind speed seems to vary, and the rotor and generator rpm vary also, but the power being produced has been a steady minus figure for five days, usually
- 0.1 KW. I check this daily.
Net power produced has dropped about 38 kwh in that time. "Power" reported was 25,122 KWH Sept. 19;…
ContinueAdded by Harrison Roper on September 24, 2012 at 5:56pm — 1 Comment
9/21/12 - UMPI turbine website reports it is ACTUALLY WORKIN , after 180 days.
As of 1:30 PM today, the "live turbine data" web page reports: wind at 7.6 mph, blade pitch at 2 degrees, rotor at 28.8 rpm, 25,000 kwh produced, generator temperature 21 C, power producrion minus 0.1kw, 412 Volts. The bar chart is unchanged and (not labled) it is about 17 months old. The power produced is a puzzle, since it gives no dates. The cute…
ContinueAdded by Harrison Roper on September 21, 2012 at 1:21pm — No Comments
After many months, the "live wind data" page of the UMPI turbine is reporting something! But the turbine is still not generating power.Iin a 12 mph wind, rotor rpm and generator rpm are zero, and power output is MINUS .4 kWh. That's 400 watts of grid power, being used to keep the machine working. At least something is working, and there is an effort to get it all…
ContinueAdded by Harrison Roper on September 19, 2012 at 1:36pm — 1 Comment
U.S. Sen Angus King
Maine as Third World Country:
CMP Transmission Rate Skyrockets 19.6% Due to Wind Power
Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.
Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT
******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********
(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/
Not yet a member?
Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?
We have the facts on our side. We have the truth on our side. All we need now is YOU.
“First they ignore you, then they laugh at you, then they fight you, then you win.”
-- Mahatma Gandhi
"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi
Task Force membership is free. Please sign up today!
Hannah Pingree - Director of Maine's Office of Innovation and the Future
"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."
https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/
© 2025 Created by Webmaster.