GREEN ENOUGH ALREADY ! REMOVE THE SUBSIDIES !

     Would anyone from the legislature be willing to offer a bill to direct the PUC to determine if there is presently enough qualified Maine Class 1 Renewable Energy Credits ( REC )  accumulated to satisfy the 2017 goal of 10% new renewable in the State's electric portfolio, assuming a 2% growth in electricity consumption from 2015 to 2017 ?  If such a scenario is presently available, then the Maine Renewable Portfolio Standard should be retired two years early and the Maine Class 1 REC Market can be closed, as it's only reason for existence is to make funds to construct new renewables to satisfy the RPS.   With Class 1 RECs going for $60+ per megawatt-hour in Conn., Mass., and R.I., there is an onslaught of wind projects wanting to build in Maine and sell renewable credits in those states. Maine ratepayers will have to pay huge sums for transmission upgrades to accommodate this amount of build-out. Maine will suffer higher electric costs  with it's participation in the New England Regional Network as this $60+ per megawatt-hour will raise retail electric costs down South and migrate back at us in Maine, most likely, by political response. 

Views: 145

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Hart Daley on January 23, 2015 at 10:05am

With 2/3 of the PUC now NEW and in place and the 3rd new member coming in Mar/Apr, this would be a good time to really push this bill!

Comment by Long Islander on January 2, 2015 at 11:19am

The task force ignored the need for massive new transmission line construction to move wind energy from turbines to market, which could be costly to ratepayers, disrupt habitat and landscape and engender significant opposition from towns and conservation groups.

Now, as wind turbines are sprouting on Maine’s mountains accompanied by heavy machinery, roads, transmission lines, substations, wells and concrete plants, that certainty is yielding to doubt for some. “I think people didn’t have a good appreciation of this, including us, for what the whole thing entails,” said Maine Audubon’s Jody Jones, a biologist who served on the task force.

http://pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-...

Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.

“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.”

http://pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-sk...

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service