This Blog location will not allow posting of this video from Rumble, so you will need to click the link.

https://rumble.com/embed/vlh0sz/?pub=fzvp9



Views: 195

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Willem Post on October 25, 2021 at 5:38pm
My two comments on Watt is up with That
 
 

1)

This is wonderful.

CCC, a bunch of RE idiots trying to pull the wool over the eyes of innocent, gullible lay people, got caught lying and obfuscating big-time.

CCC, which advises UK PM Johnson, aka, the UNRULY MOP, used 7 days of low wind in 2050, whereas the low-wind days were 65 in 2021, and 78 in 2016.
CCC wanted to make wind look extra, extra good.

More low-wind days means vastly greater CAPACITY, MW, of instantly available, reliable, low-cost, traditional power plants, which must be staffed, fueled, ready to operate, in good working order, as demanded by the UK grid operator, to fill in any wind (and solar) shortfalls; the UK has LOTS OF DAYS without sun, throughout the year.

Initially, CCC was obstructing the public release of its report to THE UNRULY MOP
CCC was ordered by the Court to release the report to the public.

Are you f….g kidding me?
We are talking hundreds of millions of small folks spending $TRILLIONS EACH YEAR, to “save the world”, and CCC is blatantly lying about the feasibility and cost!
These CCC people should be drawn and quartered.

ALL OF THIS IS AWFUL NEWS FOR THE SCOTLAND CLIMATE MEETING

BTW, every wind turbine draws significant electricity from the grid, whether it is producing or not.
 
 
 
2)
Great graph.

It clearly shows, the capacity’s factor of wind very often is less than 10%
The average CF is about 30%.

It is important to note wind power is the cube of wind speed 

In addition, at very low CFs, say 3 to 4%, with winds at 4 mph and less, the wind turbine is producing about as much as it is consuming, i.e., no net feed to the grid. Yikes

The graph shows a lot of red at low CFs, meaning onshore winds are frequently very weak.

The RE clowns at CCC are of-the-charts fabricators of lies.

They should be drawn and quartered

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service