ISO-NE: Aroostook Wind Fails Test and Proposed Transmission Project Should Be Removed from Consideration

ISO-NE Evaluating Aroostook County Wind

Note the circled item " Transfer Analysis and Accommodating Wind"

Also, see the note under the diagram.

Transfer Analysis and Accommodating Wind

Aroostook Wind Fails the Capacity Standard test, it is not useful as a new capacity: Not Baseload, Not Dispatchable, not a Peak Load Resource!

Accommodating Wind: "Capacity Standard" Model Fails Test

  • Willem Post

    Meeting requirements or not is of little importance to leftist, woke bureaucrats and wealthy elites.

    They are in it to achieve their phony “CO2 goals” that give them more power and wealth, at the impoverishing expense of all others.

    We need more CO2 ppm to increase flora and fauna, reduce desert areas, and increase crop yields per acre to better feed 8 billion people

    Net zero by 2050 to reduce CO2 is a an unaffordable suicide pact imposed on all of us by bureaucrats and wealthy entities to empower and enrich themselves. It is a total scam

  • Dan McKay

    It is sad that professional engineering principles are hijacked by politicians.