Another Wind Turbine Mass fatality Event - April 22-24, 2020

A Wind Turbine Mass fatality event was reported in Minnesota on April 22-24, 2020. Will the green cartel blame this carnage on a building light being left on or something else besides a turbine blade spinning at 200 mph?  Will they produce images of the carcasses from this event?  Or will a corrupt USFWS cart off the bodies like they always do and eliminate all the evidence?

These green energy fatality events have been taking place for decades, but have been covered up. If the Justice Department chose to throw out wind farm gag orders and interview wind farm employees, they would discover mass fatality events are a regular occurrence at every wind farm located along bird and bat migration routes.

Back in 1985, when the only legitimate wind mortality study ever conducted in the US, it was reported 6800 fatalities occurred from just 200 MW of wind energy and that most of the fatalities found were believed to be nocturnal migrants.

This Enron based industry has been lying about their industrial slaughter to birds and bats ever since. 

This disgusting industry, in collusion with the Interior Department, is set up to hide everything. It's an incredible ongoing fraud taking place, that's wiping out our flying species.  But just like the dead bald eagle, recently seen killed at that dump site in Ohio, sometimes word gets out about one of these turbine kills and they can't hide it.

Views: 335

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Jim Wiegand on May 23, 2020 at 2:26am

Narcissistic Sociopaths could give a damn.

Comment by Willem Post on May 22, 2020 at 10:38pm

Remember, it was Obama who authorized the killings, takings, all over the US, including the bald eagle.

Obama obviously loves wind turbines more than innocent fauna and flora.

The former community organizer enjoys it all in his $15-million mansion on the Martha’s Vineyard south shore.

Comment by Richard McDonald/Saving Maine on May 22, 2020 at 10:32am

In Maine. IF&W is  facilitating the problem by coveriing up the catastrophic Bull Hill takings and allowing Weaver Wind to be permitted within the shadows of Bull Hill. Downeast Wind preparing a permit foir their development in Columbia which will effect the same migratory birds killed by Bull Hill. DW will deploy the tallest turbines in the US - 650 ft massive killing machines. 

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service