Massachusetts 2 Wind Turbines = 1 Million Dollars In "Parasitic Power" Use Over Ten Years

The town of Falmouth actually increased its Green Footprint from 2008 to 2020 with electricity from the grid (local power company). 
The term "parasitic power consumption" by wind turbines means they must use electric power from the local power company to stay functional even if there is no wind or shut down by the courts. The town continues to maintain the turbines as they have to move them out of town.
Electric power energy audit into the Falmouth, Massachusetts wind turbine located at the wastewater treatment plant 2008 vs 2020 respectively, before and after the wind turbine installations does not exist.
Everyone knows a home energy auditor can help identify ways to save money on your electric bill but who is conducting the energy audits at the Falmouth Wastewater Treatment Plant before the wind turbine installations and after the 2015 and 2017 court shut down of the wind turbines?
 
Falmouth town officials for years have touted the amount of power and money the wind turbines have produced but today omit out how much power is going into the wind turbines from the local power company.
It has been said it's to difficult to determine how much electric power is going into the wind turbines because there are no electric meters between the Wastewater Treatment Plant and the turbines.
Why would over $100,000.00 a year in electric costs be ignored for all these years in all the studies?
Over ten years the additional electric use could near one million dollars.
Parasitic electric power use is like wind turbines infra-sound the owners of the turbines and manufacturers omit the bad news especially politicians who find out after the fact.
 
The annual revenue from the operation of both wind turbines is estimated at $975,000.00 or around one million so it's easy to figure ten percent for parasitic power usage.
 
Statistically, in 2013, the operation of both wind turbines generated $115.00 per hour or ($975,000 to 1,000,000.00 per year more or less).
 
The Wind II project still owes 3.5 million to an ARRA loan as it is no longer energy efficient.
The town still pays insurance and maintenance on the turbines. The town approved 2.5 million in November 2019 to move the old gear-driven wind turbines out of town.
Large wind turbines require a large amount of energy from the grid (local power company) to operate up to one-tenth or about 10 percent of their rated output.
The Falmouth wind turbines need up to $100,000.00 per year for batteries, lights, heat, AC, computers, alarms, etc. -This is 10 percent of the rated output of kWh a year of two 1.65 megawatt wind turbines.
 
Massachusetts cost per kilowatt-hour (kWh) is expensive at the third highest in the nation.
 
The manufacturers of large turbines or the Town of Falmouth never include electricity consumption from the local power company in the specifications they provide.
 
Among the wind turbine functions that use electricity are the following:
 
Yaw mechanism (to keep the blade assembly perpendicular to the wind; also to untwist the electrical cables in the tower when necessary) -- the nacelle (turbine housing) and blades together weigh 92 tons on a 1.65-MW turbine. blade-pitch control (to keep the rotors spinning at a regular rate).lights, controllers, communication, sensors, metering, data collection, etc. heating the blades -- this may require 10%-20% of the turbine's nominal (rated) power heating and dehumidifying the nacelle -- according to manufacturers, "power consumption for heating and dehumidification of the nacelle must be expected during periods with increased humidity, low temperatures and low wind speeds" oil heater, pump, cooler, and filtering system in the gearbox, hydraulic brake (to lock the blades in very high wind) - thyristors (to graduate the connection and disconnection between generator and grid) -- 1%-2% of the energy passing through is lost
 
Magnetizing the stator -- the induction generators used in most large grid-connected turbines require a "large" amount of continuous electricity from the grid to actively power the magnetic coils around the asynchronous "cage rotor" that encloses the generator shaft; at the rated wind speeds, it helps keep the rotor speed constant, and as the wind starts blowing it helps start the rotor turning (see next item); in the rated wind speeds, the stator may use power equal to 10% of the turbine's rated capacity, in slower winds possibly much more.
Wind Turbine Brake & Safety Controls, Incoming Power Sources
Electricity needed from Grid ( local power company ) up to ten percent of the rated output of wind turbines 

Views: 82

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Frank Haggerty on May 13, 2020 at 9:54am
Wind Turbines Use Up To 20 Percent of Electric Power From The  Local Power Company -TRUE 
"Parasitic Power Use" 

https://www.dailymail.co.uk/news/article-2893708/New-wind-turbine-f...

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service