Who Said Wind Turbines Aren't An Expensive Nuisance

Falmouth Massachusetts Nuisance Town Owned Wind Turbines 

Who Said Wind Turbines Aren't An Expensive Nuisance 
The Town of Falmouth, Massachusetts installed two industrial 1.65-megawatt wind turbines in 2010 and 2012 both without permits and lacked abutter notifications according to local zoning regulations. The town had been warned prior to installations by the manufacturer that each turbine generates a chest-pounding 110 decibels of noise. The warning letter was more than likely why the town went forward without permitting. 
 
In a NASA research supported by the US Department of Energy, Dr. Neil Kelly and his colleagues 1987 identified impulsive low-frequency noise. The wind turbine infrasound and vibration produced " Human Annoyance " within neighbors' homes. Falmouth neighbors complained of the same headaches, fatigue, temporary feelings of dizziness, nausea, etc. as over 40 years ago.
The Town of Falmouth taxpayers financed over 11 nuisance lawsuit complaints and appeals with residents regarding the two wind turbines located at the wastewater treatment facility on Blacksmith Shop Road.
 
Massachusetts  Superior Court in 2017 declared the turbines a nuisance and ordered the town of Falmouth to shut down two town-owned wind turbines allocating 2.5 million to remove the turbines. 
The original $5 million loan on Falmouth Wind II the second town-owned turbine was actually funded by ARRA [America Recovery and Reinvestment Act]. The Massachusetts Department of Environmental Protection through a Project Regulatory Agreement used ARRA funds to finance the town-owned turbine.  
# ARRA fund repayment 2022 
The Massachusetts Clean Water Trust, May 4, 2022, authorized the acceptance of a lump-sum payment of not less than $975,000 from the Town of Falmouth in exchange for the cancellation of the debt of the town to the Trust under Loan Agreement No. CWSG-09-36 dated January 22, 2010, as amended.
The Mass Clean Water Trust board also responded that the cash  $975,000.00 loan payment from Falmouth according to a letter from the Town of Falmouth to Mass Clean Water Trust is funded from the November 12, 2019, Falmouth Town Meeting vote to appropriate 2.5 million to remove both town-owned wind turbines.
 
The demolition bid ending on April 14, 2022, to remove the two nuisance turbines is due in a few days.
 

Views: 114

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/