SouthCoast Wind EPA Permit January 17, 2025

The Town of Nantucket in November 2024 called on the public to help safeguard one of the nation’s most treasured National Historic Landmarks. They asked that you contact the Advisory Council on Historic Preservation (ACHP) and the Massachusetts State Historic Preservation Officer (SHPO) to urge them to decline to sign the Section 106 Memorandum of Agreement (MOA) for SouthCoast Wind. Section 106 requires federal agencies to consider the effects on historic properties of projects they carry out, assist, fund, permit, license, or approve throughout the country, and to find ways to avoid, minimize, or mitigate adverse effects on those properties.
.
By January 17, 2025, the Bureau of Safety and Environmental Enforcement lifted the suspension order for the Vineyard Wind project without completing its long-promised “independent investigation” into the cause of the blade failure. 
.
BOEM blade "safety questions" remain unanswered over future projects such as SouthCoast Wind.
.
On January 17, 2025, EPA issued the final permit for the proposed construction and operation of SouthCoast Wind, LLC's offshore wind farm on the Outer Continental Shelf within miles of Nantucket. 
.
What are the odds of two major federal agencies BSEE and BOEM making decisions one week before the Presidential inauguration zero?   
.
In a video, a Biden administration staffer said they were “tossing gold bars off the Titanic” to spend billions of EPA Green Energy taxpayer dollars before President Donald Trump took office.
.
Jan 20, 2025 · Donald Trump was inaugurated as president of the United States.
.
Lee Zeldin was sworn in as the 17th Administrator of U.S. Environmental Protection Agency on January 29, 2025 
.
The public needs answers.  
.

 

  • Frank Haggerty

    Former President Joe Biden pushed as much money out the door before President Trump took office. The permit for SoutCoast Wind was issued without safety questions answered over the GE Vernova-Vineyard Wind blade failure and section 106 with the Town of Nantucket failed negotiations - There is no noise study of 200 wind turbines 12 miles off the coast and what effect on residential homes 

  • Thinklike A. Mountain

    REPORT: Sen. Tom Cotton Allegedly Working Behind the Scenes to Block Trump’s Pick, Elbridge Colby, From Getting Confirmed at the DoD
    https://www.thegatewaypundit.com/2025/02/report-sen-tom-cotton-alle...