Willem Post's Blog – April 2019 Archive (6)

IFO INSTITUTE STUDY CASTS DOUBT ON CLIMATE-SAVING CREDENTIALS OF ELECTRIC VEHICLES

A Tesla Model 3 has a worse life-cycle carbon footprint than a similar-sized Mercedes diesel car, the renowned German think tank, IFO, has found. It warns that electric vehicles are "no panacea" against climate change.

https://www.dw.com/en/ifo-study-casts-doubt-on-electric-vehicles-climate-saving-credentials/a-48460328

When the IFO released its findings…

Continue

Added by Willem Post on April 25, 2019 at 8:00pm — No Comments

EXCESSIVE SUBSIDIES FOR 2200 kW FIELD-MOUNTED SOLAR SYSTEM IN VERMONT

Most people, including myself, really have no clear idea regarding the various subsidies required to attract capital for the build-outs of solar systems. Relatively few insiders, such as some legislators, the Vermont Department of Public Service and the Vermont Public Utilities Commission, likely are intimately familiar with all the detailed ins and outs.

 

The Vermont Public Utilities Commission administers the Vermont Standard Offer Program that promotes and subsidizes the…

Continue

Added by Willem Post on April 20, 2019 at 5:00am — No Comments

LARGE-SCALE SOLAR PLANTS REQUIRE LARGE-SCALE BATTERY SYSTEMS

PV Solar Output Variability During variable Cloudy Weather

 

Clouds are the main reason PV solar generation experiences intermittency (excluding the normal night-time disappearance).

PV solar generation can rapidly decrease by 60% within seconds, due to a cloud passing over the solar panels causing a reduction in solar insolation.

The time taken for the cloud to pass is dependent upon cloud height, sun elevation and wind speed. These factors need…

Continue

Added by Willem Post on April 17, 2019 at 10:00am — 3 Comments

THE HORNSDALE POWER RESERVE, LARGEST BATTERY SYSTEM IN AUSTRALIA

The Hornsdale Power Reserve, HPR, battery system, 100 MW/129 MWh, in Australia, was the largest battery in the world in 2017. It is located near a 315-MW, French-owned wind turbine plant.

 

In 2017, various capital costs of the system were mentioned. About 1.5 y later, documents revealed the turnkey capital cost was about 56 million euros, about US$ 66 million, or 66 million/129,000 =…

Continue

Added by Willem Post on April 9, 2019 at 11:30am — 1 Comment

THE GREEN NEW DEAL AND OUR WAY OF LIFE

In view of the grave concerns raised by 5 to 17 year old children on the impact of CO2 on the Earth’s climate, the government will introduce legislation to address the most pressing issue of our times, namely CO2 emissions and the ensuing climate mayhem that they cause. See Appendix 1.

 

CO2 has risen to record levels from 0.0280% (pre-industrial) to 0.0405% today. See Appendix 2.

 

The policy, inspired by the GND, has four main aspects, for…

Continue

Added by Willem Post on April 3, 2019 at 10:30am — 7 Comments

ANALYSIS OF A 6-DAY WIND/SOLAR LULL DURING SUMMER IN NEW ENGLAND

ABSTRACT OF ARTICLE 

 

In this article it was assumed all New England fossil and nuclear plants would be closed down, and the 2017 capacities, MW, of wind and solar would be increased 22 times, to offset the electricity shortfall of the closed plants. It was assumed the load (electricity fed to grid) on the NE grid increased from about 123 TWh/y in 2018 to about 175 TWh/y in 2050, mostly due to electric vehicles and heat pumps. See tables 1 and…

Continue

Added by Willem Post on April 3, 2019 at 6:00am — 6 Comments

Monthly Archives

2024

2023

2022

2021

2020

2019

2018

2017

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service