Do not let these Green Nazi's hide their atrocities - Please circulate

This is an image of an eagle found still alive with a wing cut off from a wind turbine blade. It was sent to me by Ulla Falkdalen.

Many of these eagles live for days before dying. The eagle in the second image was located nearly a month after its outer wing tip was found under a turbine.

I have all the documentation on this.

The world needs to see things like this and not let the profit driven green Nazi's hide their atrocities. If the public had access to this information and the Interior Department were not hiding it, they would see images of over 2000 chopped up eagles like these every year. For all other raptors, the numbers are several hundred thousand. 

For their slaughter, taxpayers are rewarding these bastards billions in Production Tax Credits annually .

Freezer image from the Interior Department's Denver Eagle repository.  The primary source for all  these eagle carcasses ...........................Wind farms.

Views: 539

Comment

You need to be a member of Citizens' Task Force on Wind Power - Maine to add comments!

Join Citizens' Task Force on Wind Power - Maine

Comment by Willem Post on September 14, 2019 at 2:16pm

Wall Street and Warren Buffett LOVE their wind turbines, because they make them tens of $billions every year, while they BOUGHT permission from Obama to kill the American Eagle. He just bought a $15 million mansion on Martha’s Vineyard with money from rigged/political buyback book deals.

Of course, Obama thinks killing eagles is less important than expensive wind turbines that produce heavily subsidized variable, intermittent electricity at 2 times the price of NE wholesale grid prices.

That electricity could not even exist on the grid without other generators doing the babysitting, i.e., provide peaking, filling in, and balancing services 24/7/365, which does not come for free.

The more wind and solar, the more such services.

But what happens when there is a wind and solar lull for 4 to 6 days as happens, at random, several times per year.

Wind and solar electricity would be near zero.

All the other generators would have to be able to serve almost the ENTIRE DEMAND.

So you cannot retire these generators, ever.

They have to be kept in good repair, staffed and fueled, ready to go when such lulls occur.

That is not for free in Germany and certainly will not be in New England.

 

Maine as Third World Country:

CMP Transmission Rate Skyrockets 19.6% Due to Wind Power

 

Click here to read how the Maine ratepayer has been sold down the river by the Angus King cabal.

Maine Center For Public Interest Reporting – Three Part Series: A CRITICAL LOOK AT MAINE’S WIND ACT

******** IF LINKS BELOW DON'T WORK, GOOGLE THEM*********

(excerpts) From Part 1 – On Maine’s Wind Law “Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine if the law’s goals were met." . – Maine Center for Public Interest Reporting, August 2010 https://www.pinetreewatchdog.org/wind-power-bandwagon-hits-bumps-in-the-road-3/From Part 2 – On Wind and Oil Yet using wind energy doesn’t lower dependence on imported foreign oil. That’s because the majority of imported oil in Maine is used for heating and transportation. And switching our dependence from foreign oil to Maine-produced electricity isn’t likely to happen very soon, says Bartlett. “Right now, people can’t switch to electric cars and heating – if they did, we’d be in trouble.” So was one of the fundamental premises of the task force false, or at least misleading?" https://www.pinetreewatchdog.org/wind-swept-task-force-set-the-rules/From Part 3 – On Wind-Required New Transmission Lines Finally, the building of enormous, high-voltage transmission lines that the regional electricity system operator says are required to move substantial amounts of wind power to markets south of Maine was never even discussed by the task force – an omission that Mills said will come to haunt the state.“If you try to put 2,500 or 3,000 megawatts in northern or eastern Maine – oh, my god, try to build the transmission!” said Mills. “It’s not just the towers, it’s the lines – that’s when I begin to think that the goal is a little farfetched.” https://www.pinetreewatchdog.org/flaws-in-bill-like-skating-with-dull-skates/

Not yet a member?

Sign up today and lend your voice and presence to the steadily rising tide that will soon sweep the scourge of useless and wretched turbines from our beloved Maine countryside. For many of us, our little pieces of paradise have been hard won. Did the carpetbaggers think they could simply steal them from us?

We have the facts on our side. We have the truth on our side. All we need now is YOU.

“First they ignore you, then they laugh at you, then they fight you, then you win.”

 -- Mahatma Gandhi

"It's not whether you get knocked down: it's whether you get up."
Vince Lombardi 

Task Force membership is free. Please sign up today!

Hannah Pingree on the Maine expedited wind law

Hannah Pingree - Director of Maine's Office of Innovation and the Future

"Once the committee passed the wind energy bill on to the full House and Senate, lawmakers there didn’t even debate it. They passed it unanimously and with no discussion. House Majority Leader Hannah Pingree, a Democrat from North Haven, says legislators probably didn’t know how many turbines would be constructed in Maine."

https://pinetreewatch.org/wind-power-bandwagon-hits-bumps-in-the-road-3/

© 2024   Created by Webmaster.   Powered by

Badges  |  Report an Issue  |  Terms of Service